       10 major wind projects in development in 2022
   DIR By: AGelbert
       Date: August 24, 2022, 8:33 pm
       ---------------------------------------------------------
  HTML https://ci4.googleusercontent.com/proxy/2_IN1MJGf4OkBesWZi77BP6Ylt6SRUMuCuRFL1jFtxyy4DlB1c6NRaAujgNNfEHFM2QayBJ0hPzksQrR3nr7kATqsmYlrsMXjsmJnS1l62I=s0-d-e1-ft#http://media.pennnet.com/designimages/REW-0262_Energy_375.jpg
       8.23.2022 By David Cox, PE - President FirmoGraphs -
       [center]
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-040422164555-532108.png[/center]
       [center]10 major wind projects in development in 2022
  HTML https://www.renewableenergyworld.com/wind-power/10-major-wind-projects-in-development-in-2022/?utm_source=rew_weekly_newsletter&utm_medium=email&utm_campaign=2022-08-24[/center]
       #Post#: 575--------------------------------------------------
       Wind Power applications NEED STRONG Ropes, Lines, Slings &
       Chains
   DIR By: AGelbert
       Date: October 7, 2022, 2:43 pm
       ---------------------------------------------------------
       [center]Dyneema® is helping deliver a renewable energy future
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-050422145344-560693.png[/center]
       [center]
  HTML https://youtu.be/SCh9VR0tQxs[/center]
       APPLICATIONS Ropes, Lines, Slings & Chains
       Dyneema® 5.11K subscribers
       At DSM we are proud to play an important role in renewable
       energy generation. We are committed to the United Nations
       Sustainable Development goals, and as part of this continue to
       advocate responsible action on climate change with our
       stakeholders, while increasing the use of renewables in our
       energy mix to reduce our carbon footprint. Dyneema® is helping
       deliver a renewable energy future.
       With renewable power sources like wind farms increasingly
       recognized as an answer to the world’s rising ⚡ energy
       demands, ropes, slings and synthetic chains made with Dyneema®
       will play a significant role in making renewable energy viable.
  HTML http://renewablerevolution.createaforum.com/gallery/renewablerevolution/3-250817121649.png
  HTML https://www.dsm.com/dyneema/en_GB/home.html
       #Post#: 587--------------------------------------------------
       All 33 NEW offshore wind turbines have now been installed.
   DIR By: AGelbert
       Date: October 11, 2022, 3:51 pm
       ---------------------------------------------------------
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-180822134328.png
       October 10, 2022 By Mike Schuler
       [center]
  HTML https://gcaptain.com/wp-content/uploads/2022/10/pro0062_02.jpg[/center]
       Photo courtesy Akita Offshore Wind Corporation
       [center]Japan’s First Commercial Offshore Wind Farm Takes Shape
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-120422122257-65551.png[/center]
       All 33 offshore wind turbines have now been installed
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-050422144605.png<br
       />at Japan’s first commercial-scale offshore wind farm.
       The installation was carried out by Seajacks International’s
       Seajacks Zaratan jackup vessel at the Akita and Noshiro offshore
       wind farm situated off the Japanese Akita Prefecture.
       The project, which is owned by Akita Offshore Wind Corporation
       (AOW), is the first commercial-scale fixed-bottom wind farm to
       be constructed in Japan. It is being constructed at two
       locations just off Akita Port and the nearby Noshiro Port.
       The two locations have a total capacity of 140 megawatts (MW),
       enough to &#9889; power approximately 150,000 homes. The power
       will be sold to Tohoku Electric Power Co. under a 20-year
       purchase agreement.
       [center]
  HTML https://gcaptain.com/wp-content/uploads/2022/10/pro0062_01-1536x1023.jpg[/center]
       Akita Offshore Wind Corporation
       “The completion of the turbine installation at Akita and Noshiro
       is an achievement that all parties involved can be proud of.
  HTML http://renewablerevolution.createaforum.com/gallery/renewablerevolution/3-250817121649.png<br
       />The project is a powerful demonstration of a successful
       collaboration between international partners to deliver a
       successful project outcome,” said Seajacks CEO, Blair Ainslie.
       “It is a testament to the capabilities of all parties, that the
       project has been completed safely and without any major
       incidents, despite the challenges of the Covid-19 pandemic.”
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-070422160139.gif
       Commercial operations of the wind farm are planned to begin
       later this year.
       UK-based Seajacks International is a wholly owned subsidiary of
       Eneti Inc. (NYSE: NETI). The company owns and operates an
       advanced fleet of self-propelled jack-up vessels
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-120422122720-6841842.png<br
       />operating in offshore wind and oil and gas sectors.
  HTML https://gcaptain.com/japans-first-commercial-offshore-wind-farm-takes-shape/
       #Post#: 595--------------------------------------------------
       Floating Offshore Wind Pipeline Sees Explosive Growth &#127774;
   DIR By: AGelbert
       Date: October 13, 2022, 3:08 pm
       ---------------------------------------------------------
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-180822134328.png
       October 12, 2022 By Mike Schuler
       [center]
  HTML https://gcaptain.com/wp-content/uploads/2022/09/support-of-offshore-floating-wind-turbines-1.jpeg[/center]
       Illustration of a floating offshore wind farm courtesy Damen
       [center]Floating Offshore Wind Pipeline Sees Explosive Growth
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-050422133440.gif[/center]
       The global pipeline of floating offshore wind projects has more
       than doubled in terms of capacity in the past year with the UK
       leading the charge, according to a new report by RenewableUK.
       According to the report, the number of projects in the global
       pipeline, spanning from those in early planning stages to
       operational, has increased from 130 projects to 230 projects in
       just the last 12 months. In terms of capacity, the pipeline has
       expanded from 91GW a year ago to 185GW today.
       The pipeline in the UK is much larger than that of any other
       country. A year ago, the UK had 23GW worth of floating wind
       capacity in the pipeline, compared to over 33GW today. Over the
       same period, the number of projects has increased from 29 to 51,
       with projects planned in the North Sea, Celtic Sea and the North
       Atlantic Ocean.
       Among the 185GW global pipeline, nine projects representing
       121MW capacity are fully commissioned in seven countries.
       Another 96MW worth of projects are under construction, 288MW are
       consented or in the pre-construction phase, 31GW are in planning
       or has a lease agreement, and 153GW are in early development or
       in the leasing process.
       Europe represents approximately 58%, or 107GW, of the floating
       capacity pipeline, while UK represents 18% with 33.3GW, of which
       29GW is planned in Scottish waters. Outside Europe, leasing
       areas off the west coast of the United States, along with
       project proposals off the south east coast of Australia and
       South Korea, make up the majority of the rest of the capacity.
       The report states that by the end of 2030, commissioned floating
       wind capacity in the UK could reach 11GW, with 31GW in Europe
       and 41GW globally.
       The report also notes that demand for floating foundations is
       expected to ramp up fast, with the potential for nearly 1,000
       floating foundations to be installed in UK waters by the end of
       2030, with 3,200 floating foundations installed globally by the
       end of the decade.
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-050422180949.png
       “The growth of floating offshore wind is surging ahead at a
       phenomenal rate year on year around the world. We’re proud that
       the UK is a global leader in this innovative technology with
       nearly a fifth of the total pipeline – significantly greater
       than any other country,” say RenewableUK’s CEO Dan McGrail. “In
       the years ahead, as we build projects further out to sea where
       wind speeds are even stronger, floating wind will play a central
       role in proving cheap, clean electricity for British homes as
       well as boosting our energy security.
       “It also offers a significant opportunity to build up a whole
       new industry in the UK, with a world-class supply chain which
       will enable us to export our expertise and state of the art
       technology worldwide,” McGrail adds.
  HTML https://gcaptain.com/floating-offshore-wind-pipeline-sees-explosive-growth/
       #Post#: 699--------------------------------------------------
       Kite Wind Power for Ships!
   DIR By: AGelbert
       Date: December 7, 2022, 4:22 pm
       ---------------------------------------------------------
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-180822134328.png
       December 6, 2022 by Mike Schuler
       [center]
  HTML http://www.createaforum.com/gallery/renewablerevolution/3-301014182902.gif<br
       />[shadow=blue,left]Kite System[/shadow] for Ships Trialed on
       Transatlantic Voyage
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-220922210737-19981913.png[/center]
       France-based wind propulsion specialist Airseas is sharing the
       first footage of its automated kite system Seawing in use during
       transatlantic sea trials.
       The trial took place on board the roll-on/roll-off ship Ville de
       Bordeaux as it transported aircraft components between Europe
       and the United States. With the release of the new footage,
       Airseas is also announcing the successful completion of the
       crucial initial stages of sea trials.
       Flying at an altitude of about 200 meters, the Seawing system
       comes in both 250 sq meter 500 sq meter versions, both of which
       were on board for the trial.
       Combining expertise from the aerospace and maritime sectors,
       Seawing is aiming to slash fuel consumption and emissions by an
       average of 20% by harnessing the wind to reduce the main engine
       load. It’s using “digital twins” and advanced automation systems
       to ensure that the system could be safely deployed, operated and
       stored at the push of a button with minimal input or training
       needed from crew.
       The 154-meter-long Ville de Bordeaux is operated by Louis
       Dreyfus Armateurs (LDA) and chartered by Airbus, Airseas’
       minority shareholder and launch customer. A team of Airseas
       engineers is on board to test the system and gather data, with
       the operational support of LDA’s crew and Airbus’ Transport &
       Logistics department.
       [center]
  HTML https://youtu.be/opNhqdeif5w[/center]
       [center]
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-120422122703-6831203.png<br
       />
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-110422180553-643238.gif[/center]
       The Seawing system has applications on virtually any type of
       commercial vessel. Airseas has also received firm orders from K
       Line, a Japanese shipowner who owns the fifth largest fleet
       worldwide, for five Seawing systems, with additional options to
       equip up to 51 vessels in total.
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-050422130124.jpeg
       Airseas says the first stages of the sea trials have
       successfully validated key steps such as the folding and
       unfolding of the wing, take-off and landing, and flights in
       altitude. The next phase will test the Seawing in a broader
       range of weather conditions and fine-tune the automation system.
       “Seeing the Seawing in action on a commercial vessel is such a
       proud moment for us, and the culmination of years of meticulous
       research and development,” said Vincent Bernatets, CEO of
       Airseas. “Testing a brand new technology in real-life conditions
       and while respecting the operational constraints of a commercial
       ship is an ambitious endeavour, and the solid progress of our
       sea trials is a testimony to the dedication of our team of
       engineers on board and on shore.”
       “With these strong initial results, we’re more determined than
       ever to keep testing the system and collecting data, and
       accelerate our mission to scale up and rapidly deploy wind
       propulsion technology on vessels around the world. Immediate
       action is needed to tackle climate change and shipping’s impact
       on GHG emissions; we are proud to have a solution that can help
       ships reduce their emissions right now, and accelerate the
       decarbonisation of the maritime sector over the coming years.,”
       Bernatets added.
       The deployment of Seawing on commercial voyages could mark an
       important milestone for wind propulsion technology in commercial
       maritime shipping, which is responsible for about 3% of global
       greenhouse gas emissions.
       “We are committed to playing an active role in reducing
       shipping’s carbon emissions, starting now. We are proud to be
       associated with this project as a supplier and partner of
       Airbus, working for the success of this innovative wind
       propulsion solution alongside Airseas,” said Antoine Person,
       Corporate Secretary of Louis Dreyfus Armateurs.
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-050422133332.gif
  HTML https://gcaptain.com/new-kite-system-for-ships-trialed-on-transatlantic-voyage/
       #Post#: 705--------------------------------------------------
       How Do Floating Wind Turbines Work?
   DIR By: AGelbert
       Date: December 12, 2022, 2:57 pm
       ---------------------------------------------------------
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-180822134328.png
       December 11, 2022 Editorial
       [center]
  HTML https://gcaptain.com/wp-content/uploads/2022/12/file-20210624-21-uyv33f.jpg.webp[/center]
       [center]How Do Floating Wind Turbines Work?[/center]
       SNIPPETS:
       Three main ways to float a turbine
       A floating wind turbine works just like other wind turbines –
       wind pushes on the blades, causing the rotor to turn, which
       drives a generator that creates electricity. But instead of
       having its tower embedded directly into the ground or the
       seafloor, a floating wind turbine sits on a platform with
       mooring lines, such as chains or ropes, that connect to anchors
       in the seabed below.
       These mooring lines hold the turbine in place against the wind
       and keep it connected to the cable that sends its electricity
       back to shore.
       Most of the stability is provided by the floating platform
       itself. The trick is to design the platform so the turbine
       doesn’t tip too far in strong winds or storms.
       [center]
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-121222160217.webp[/center]
       Three of the common types of floating wind turbine platform.
       Josh Bauer/NREL
       There are three main types of platforms:
       &#1421; A spar buoy platform is a long hollow cylinder that
       extends downward from the turbine tower. It floats vertically in
       deep water, weighted with ballast in the bottom of the cylinder
       to lower its center of gravity. It’s then anchored in place, but
       with slack lines that allow it to move with the water to avoid
       damage. Spar buoys have been used by the oil and gas industry
       for years for offshore operations.
       &#1421; Semisubmersible platforms have large floating hulls that
       spread out from the tower, also anchored to prevent drifting.
       Designers have been experimenting with multiple turbines on some
       of these hulls.
       [center]
  HTML https://gcaptain.com/wp-content/uploads/2022/12/file-20210713-17-21i31p.jpg.webp[/center]
       The University of Maine has been experimenting with a small
       floating wind turbine, about one-eighth scale, on a
       semisubmersible platform with RWE, one of the winning bidders.
       AP Photo/Robert F. Bukaty
       &#1421; Tension leg platforms have smaller platforms with taut
       lines running straight to the floor below. These are lighter but
       more vulnerable to earthquakes or tsunamis because they rely
       more on the mooring lines and anchors for stability.
       Each platform must support the weight of the turbine and remain
       stable while the turbine operates. It can do this in part
       because the hollow platform, often made of large steel or
       concrete structures, provides buoyancy to support the turbine.
       Since some can be fully assembled in port and towed out for
       installation, they might be far cheaper than fixed-bottom
       structures, which require specialty vessels for installation on
       site. ... ...
       Why do we need floating turbines?
       Full detailed article:
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-040422164615-5351419.gif
  HTML https://gcaptain.com/how-do-floating-wind-turbines-work/
       #Post#: 723--------------------------------------------------
       Orsted’s project in northern Sweden, known as FlagshipONE, will
       start operating in 2025
   DIR By: AGelbert
       Date: December 20, 2022, 11:26 am
       ---------------------------------------------------------
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-180822134328.png
       December 19, 2022 Bloomberg
       [center]Wind Power Giant Will Make Green Shipping Fuel at Big
       Plant in Sweden[/center]
       SNIPPET:
       FlagshipONE combines a series of technologies that will all play
       a growing role in the coming years if the EU is to achieve its
       ambition to reach net-zero emissions by the middle of the
       century.
       In one part, the site will use 70 megawatts of electrolyzers
       supplied by Siemens Energy AG to produce hydrogen from Sweden’s
       electric grid that’s more than 90% supplied by renewable
       sources. At the same time, machines made by startup Carbon Clean
       will trap CO2 that’s released from a nearby combined heat and
       power plant that burns biomass. That CO2 will be combined with
       the hydrogen using synthesis equipment from Topsoe to form
       methanol, which can be used to fuel ships.
       The 50,000 tons of the fuel will be roughly enough to power a
       single vessel to make a transatlantic voyage, Breese said. It
       could also be used locally to power ferries within Europe,
       rather than using &#129430; fossil fuels.
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-050422180949.png
       Full article:
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-040422164555-532108.png
  HTML https://gcaptain.com/wind-power-giant-will-make-green-shipping-fuel-at-big-plant-in-sweden
       #Post#: 872--------------------------------------------------
       The state Board of Public Utilities granted Orsted, the Danish
       wind energy developer, approvals toward several easements
   DIR By: AGelbert
       Date: February 22, 2023, 10:50 am
       ---------------------------------------------------------
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-010223211240.png
       February 20, 2023
       [center]
  HTML https://images.renewableenergyworld.com/wp-content/uploads/2021/09/Screen-Shot-2021-09-07-at-6.50.58-AM-1-1536x864.png[/center]
       Denmark's [glow=green,2,300]North Sea energy island [/glow]will
       produce 3 GW of energy, with a long-term expansion goal of 10
       GW, using [glow=green,2,300]200 offshore wind turbines[/glow].
       (Courtesy: Orsted)
       [center]NJ regulators bypass &#128024;&#129430;&#128127;
       [glow=brown,2,300]local opposition[/glow] to advance
       [glow=green,2,300]offshore wind farm[/glow]
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-050422144605.png[/center]
       SNIPPETS:
       They used an amendment to New Jersey’s offshore wind law passed
       in 2021 and signed into law by Democratic Gov. Phil Murphy
       removing most local control over where offshore wind projects
       come ashore. The law enables an offshore wind developer to apply
       to the utilities board for an order superseding local control
       over such projects. ... ...
       Fiordaliso said the route of the proposed transmission line will
       not harm Ocean City or Cape May County aesthetically or
       economically. The [glow=rblue,2,300] &#9889; power cable[/glow]
       will run from [glow=green,2,300]wind turbines[/glow] that the
       company says will be located 15 miles offshore and come ashore
       in Ocean City, where it will run underground along existing
       roadways and [glow=green,2,300]&#9889; connect[/glow] to the
       [glow=blue,2,300] &#9889; electrical grid[/glow] at the site of
       the former B.L. England power plant in Upper Township.
       Full article:
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-040422164615-5351419.gif
  HTML https://www.renewableenergyworld.com/wind-power/nj-regulators-bypass-local-opposition-to-advance-offshore-wind-farm/
       #Post#: 901--------------------------------------------------
       Members of the consortium include Patriot Marine, which will be
       providing a crew transfer vessel (CTV) for the 800 mW Vi
   DIR By: AGelbert
       Date: March 1, 2023, 2:39 pm
       ---------------------------------------------------------
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-180822134328.png
       February 1, 2022 By Barry Parker (gCaptain) –
       [center]
  HTML https://gcaptain.com/wp-content/uploads/2023/02/Crowley-offshore-vessel-compilation-1536x994.jpg[/center]
       Illustration courtesy Crowley
       [center]Offshore Wind’s [glow=blue,2,300]Jones Act Supply Chain
       Getting into
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-080822141006-1726249.png<br
       />Gear[/glow][/center]
       SNIPPET:
       Panelist Jeff Andreini of Crowley, which is involved in multiple
       aspects of the business (“across five verticals”), conveyed his
       company’s enthusiasm, as indicated by views such as: “Crowley is
       extremely bullish” and “we are all in,” when describing
       Crowley’s commitment. He he explained the company had begun in
       2016 “chartering our tugs and barges to be able to do the
       feedering that’s going to be required today.”
       The company’s involvement “ramped up in 2020, when: “we decided
       that we wanted to be much more than just a tug and barge
       provider. Today our vision is to be a full-service turnkey
       provider for the supply chain.”
       He acknowledged that skepticism exists about offshore wind’s
       course forward, but said: “We are not [skeptical]…in fact, we
       have won contracts and will get started with our first one here
       in May, when we will be transporting, via tug and barge, the
       transformer for the South Fork project—out of the Gulf of Mexico
       up to New York. We will follow that up with our first feedering
       project—two tugs and a barge, to do the transportation of the
       components of the South Fork project, out of New London,
       Connecticut. And, then, next year, working together with Fred
       Olsen… out of the New Jersey wind port, we’ll be transporting 98
       turbines…for well over a year and a half.”
       The 1.1 gW Ocean Wind 1 windfarm, in Atlantic waters east of
       Cape May, New Jersey. will be a much larger project than the 132
       mW South Fork wind farm, located in waters to the east of
       Montauk, New York, and utilizing 12 turbines.
       Full article:
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-040422164615-5351419.gif
  HTML https://gcaptain.com/offshore-winds-jones-act-supply-chain-getting-into-gear/
       #Post#: 996--------------------------------------------------
       Wind project will generate enough electricity to supply 1.6
       million German households every year
   DIR By: AGelbert
       Date: April 14, 2023, 12:05 pm
       ---------------------------------------------------------
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-180822134328.png
       April 13, 2023 By Mike Schuler
       [center]Havfram Wind Adds to Contract Backlog[/center]
       RWE and Northland Power are one step closer to deploying their
       joint offshore wind project,
       [glow=teal,2,300]Nordseecluster[/glow], after selecting Havfram
       Wind as the preferred supplier.
       The Nordseecluster project will produce up to
       [glow=green,2,300]&#9889; 1.6 gigawatts (GW)[/glow] of power and
       consist of four offshore wind farm sites in the German North
       Sea.
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-050422133332.gif
       Havfram Wind will transport and support the installation of a
       minimum of 104 Vestas offshore wind turbines with a capacity of
       15 MW each.
       The Nordseecluster will be constructed in two phases, with
       [glow=green,2,300]commercial operations starting[/glow] in early
       2027 and early 2029, respectively.
       Havfram Wind will be utilizing one of its newly built NG20000X
       Jack-Up vessels with a 3,250-tonne crane.
       [center]
  HTML https://gcaptain.com/wp-content/uploads/2023/04/Havfram-Wind-NG20000X-Jack-Up-vessel-with-a-3250-ton-crane-I-1536x864.jpg[/center]
       The project is expected to generate enough green electricity to
       supply the equivalent of 1.6 million German households every
       year.
       “Signing the preferred supplier agreement for the transport and
       installation support of the entire lot of wind turbines for a
       gigantic project like Nordseecluster is proof of our growing
       position in the market,” said Even Larsen, CEO Havfram Wind. “I
       am proud of the trust RWE and Northland Power have in the
       Havfram Wind team. Participating in such a project of scale is a
       milestone for our development as a pure play offshore wind
       company.”
       The NG20000X jack-up is one of up to four Wind Turbine
       Installation Vessels (WTIVs) Havfram Wind has on order at the at
       CIMC-Raffles shipyard in China. The vessels, equipped with a
       3,250-tonne crane and hybrid battery propulsion, will be capable
       of handling the world’s largest wind turbines (20+ megawatts) in
       waters up to 70 meters deep. Delivery of the first vessel is due
       in 2024.
       Last month, offshore wind developer Ørsted selected Havfram Wind
       to install turbines for the massive Hornsea 3 offshore
       [glow=teal,2,300]wind farm project [/glow]in the North Sea off
       England. The colossal project will encompass up to
       [glow=teal,2,300]231 offshore wind turbines[/glow] producing
       [glow=green,2,300]&#9889; 2.8 GW[/glow] of offshore wind energy.
  HTML https://soberthinking.createaforum.com/gallery/soberthinking/1-050422133440.gif
       Havfram was reorganized in 2022 following a $250 million
       investment from its majority shareholder, Seabrook Capital,
       along with Canada’s PSP investment. Under the new structure,
       Havfram AS (formerly known as Ocean Installer AS) was split into
       Havfram Wind, which will focus entirely on the offshore wind
       sector, and Havfram Subsea, a subsea company.
  HTML https://gcaptain.com/havfram-wind-adds-to-contract-backlog/
       *****************************************************
       Page 2 of 3
   DIR Previous Page
   DIR Next Page