       #Post#: 648--------------------------------------------------
       Dam Hydropower
   DIR By: AGelbert
       Date: January 2, 2014, 5:22 pm
       ---------------------------------------------------------
       Ghana's 400-MW Bui hydropower plant completed
  HTML http://streamafrica.com/wp-content/uploads/2013/07/ghana_map.jpg
  HTML http://www.globaltimes.cn/Portals/0/attachment/2011/5b28a836-7d3d-4d28-b30f-1e592f450dc5.jpg
  HTML http://www.hydroworld.com/articles/2013/12/ghana-s-400-mw-bui-hydropower-plant-completed.html
       #Post#: 1233--------------------------------------------------
       Pumped Storage Hydrpower Dam: Linthal 2015 Takes Shape In Swiss
       Alps
   DIR By: AGelbert
       Date: May 27, 2014, 1:32 pm
       ---------------------------------------------------------
       Nuclear-Strength Linthal 2015 Takes Shape In Swiss Alps
  HTML http://i0.wp.com/cleantechnica.com/files/2014/05/Gruner-transport-dumper-on-cables.png
       [img]
  HTML http://grist.files.wordpress.com/2013/11/aaa-spill-popcorn-mean-girls.gif?w=350&h=219[/img]
       Yes, this is a picture of a dump truck being hoisted up a
       mountain on cables. And no, it’s not photoshopped. You’re
       looking at the largest cable lift in the world, almost 2
       kilometers long and 600 meters high, with two towers, a load
       capacity of up to 40 tons, cables 90 mm thick, and a pretty good
       speed of 5 meters per second.
       The system took three years to build. And transport dumpers are
       not the heaviest loads it can carry  :o, although they’re
       probably the most photogenic. ;D  The system can also lift whole
       ship containers.
  HTML http://www.coh2.org/images/Smileys/huhsign.gif
       Next surprise: this mammoth cable system is only a temporary
       fixture. It’s there to support construction of a huge $1.5
       billion hydroelectric pumped-storage power plant called Linthal
       2015.
       Workers from the Linth-Limmern AG utility, its partners the
       Canton of Glarus and Axpo AG, are now building this electric
       Godzilla about an hour from Zurich, Switzerland, high in the
       rocky Glarner mountains of the eastern Alps. As you can see from
       the photo, the area is so mountainous that road access for
       construction is impossible—thus the cableways.
  HTML http://i1.wp.com/cleantechnica.com/files/2014/05/Gruner-pumped-hydro-storage-facility.png
       Peak energy demand in the European grid is growing steadily.
       Consumption patterns and forms of production have changed
       considerably since construction of the original infrastructure.
       Production peaks/shortfalls from renewable power sources may
       require balancing at short notice. Also, security of supply has
       become a higher priority. These considerations all increase the
       usefulness of electric generators with peak-power storage. As
       well as providing power, Linthal 2015 will basically act as a
       huge battery.
  HTML http://www.pic4ever.com/images/19.gifhttp://elqahera-trading.com/home/wp-content/uploads/2012/04/dollar-sign-thumbnail1.jpg<br
       />
       Workers expect to complete the plant next year. (Their
       grandparents had a little practice with this type of project,
       having built an artificial lake [the Limmernsee] and an earlier
       480 MW power plant lower down the mountain, at 1,900m above sea
       level, in the 1960s.) The new storage lake (Muttsee) will be 600
       meters higher up the mountain than the Limmernsee. The lakes
       will be connected via two headrace tunnels and produce a net
       hydraulic head of 623 meters (2,044 ft).
  HTML http://i2.wp.com/cleantechnica.com/files/2014/05/Mountain-cross-section.png
       
  HTML http://www.pic4ever.com/images/8.gif
       A huge, deep cave with an inclined underground access gallery
       will house all the turbine and transformer machinery. Planned
       pump and turbine power is about 1,000 MW. With the output from
       the original facility, the Linthal 2015 project will produce
       easily as much power as a nuclear generating
       station.
  HTML http://www.freesmileys.org/emoticons/tuzki-bunnys/tuzki-bunny-emoticon-005.gif<br
       />It will rank among the top 15 pumped-storage plants in the
       world.
  HTML http://www.freesmileys.org/emoticons/tuzki-bunnys/tuzki-bunny-emoticon-013.gif
       The cablecar system will be dismantled when a funicular railway
       inside the gallery is complete. The railway will transport
       large, heavy machine components—including 215-ton
       transformers—and personnel directly from the base installation
       site of Tierfehd, near the foot of the mountain, to the turbine
       cavern. 380 kV cables run along the gallery shoulders will
       transmit the generated power.
       Now, would you like to hear about the avalanche protection
       system?
  HTML http://www.coh2.org/images/Smileys/huhsign.gif
       ;D OK,
       maybe next time…. (If you really want to know, access the
       article by Thomas Rentsch and Ruedi Stüssi in the online
       Proceedings of the International Snow Science Workshop 2009.)
       Keep up to date with all the hottest cleantech news by
       subscribing to our (free) cleantech newsletter, or keep an eye
       on sector-specific news by getting our (also free) solar energy
       newsletter, electric vehicle newsletter, or wind energy
       newsletter.
  HTML http://cleantechnica.com/2014/05/26/nuclear-strength-linthal-2015-takes-shape-swiss-alps/
       #Post#: 1238--------------------------------------------------
       Re: Dam Hydropower
   DIR By: AGelbert
       Date: May 27, 2014, 4:46 pm
       ---------------------------------------------------------
       RusHydro Starts-Up New 640-MW Unit at Sayano-Shushenskaya, Two
       More Coming Soon
       Linas Jegelevicius, International Correspondent
       May 27, 2014
       JSC RusHydro, Russia’s largest power-generating company, has
       announced that a new 640-MW hydropower unit has been
       commissioned at the company’s Sayano-Shushenskaya hydropower
       plant (HPP), in addition to the other 8 hydropower units in
       operation at the plant.
  HTML http://www.createaforum.com/gallery/renewablerevolution/3-141113185047.png<br
       />
       full story here:
  HTML http://www.renewableenergyworld.com/rea/news/article/2014/05/rushydro-starts-up-new-640-mw-unit-at-sayano-shushenskaya-two-more-coming-soon
       #Post#: 1339--------------------------------------------------
       Re: Dam Hydropower
   DIR By: AGelbert
       Date: June 10, 2014, 7:48 pm
       ---------------------------------------------------------
       Canadian News
       05/15/2014
       Hydro-Quebec celebrates 70th anniversary
       Canadian provincial utility Hydro-Quebec celebrated its 70th
       anniversary in mid-April, noting that hydroelectric power was
       and continues to be part of the company's success.
       Founded April 14, 1944, with the passage of an act establishing
       the Quebec Hydro-Electric Commission, Hydro-Quebec wasted little
       time breaking ground on its 1,178-MW Bersimis 1 and 869-MW
       Bersimis 2 hydro plants.
       The boom in energy demand post-World War II quickly necessitated
       the construction of additional projects, with hydro plants on
       the Manicouagan River and Riviere Aux Outardes being built in
       the late 1950s.
       Hydro-Quebec faced a pivotal moment in fall 1962 when the
       provincial government, headed by Jean Lesage, proposed the
       nationalization of all power utilities under the election slogan
       "Maitres Chez Nous," or "Masters in Our Own House." The movement
       led Hydro-Quebec to purchase 10 privately-held electric
       companies in May 1963 under the direction of Rene Levesque.
       Since then, the utility has faced a number of challenges,
       including standardizing rates throughout the province,
       electrifying rural areas and setting up an effective
       distribution grid.
       The company now operates 61 hydro projects that have a
       cumulative capacity of more than 36,000 MW,  ;D manages 34,000
       km of transmission lines, employees 20,000 people, supplies 4.1
       million customers and controls assets worth US$66.6 million.
       Changes to Upper Lillooet hydropower project
       Canadian power producer Innergex Renewable Energy Inc. has
       reached agreements with provincial utility BC Hydro regarding
       components of the Upper Lillooet hydropower project.
       The Upper Lillooet project - which would have included the 74-MW
       Upper Lillooet, 23-MW Boulder Creek and 16-MW North Creek
       hydropower stations - will be located on Crown land in British
       Columbia.
       The project was granted environmental assessment certificates
       from the British Columbia government this past January.
       The new agreement increases Upper Lillooet's capacity to 81.4 MW
       and Boulder Creek's to 25.3 MW. Meanwhile, the North Creek
       hydroelectric plant has been cancelled.
       The project is being developed by Creek Power Inc., which is a
       joint venture between Innergex and the Ledcor Power Group Ltd.
       Partnership announced for Jimmie Creek project
       Alterra Power Corp. and Fiera Axium Infrastructure Inc. have
       announced a partnership agreement for the ownership and
       construction of the 62-MW Jimmie Creek hydroelectric plant.
       Under the deal, Alterra will own 51% of the project, while Fiera
       will own the remainder through a managed fund.
       Alterra assumed 100% ownership of the project in November 2013
       from General Electric, after signing development agreements with
       the Klahoose First Nation for its construction in May 2012.
       Construction is under way, with an expected completion date in
       August 2016.
       "We are delighted to add another hydropower project to our
       diversified fund portfolio," Fiera executive Dominic Chalifoux
       said.
       All power generated by Jimmie Creek will be sold to BC Hydro
       under a 40-year contract. Financial closing for the deal was
       expected later this quarter.
       Canadian developer eyes pumped-storage projects
  HTML http://www.clker.com/cliparts/c/8/f/8/11949865511933397169thumbs_up_nathan_eady_01.svg.hi.png<br
       />
       Canadian company Turning Point Generation has announced its plan
       to develop a pumped-storage hydropower project in Alberta with a
       capacity of 80 to 150 MW.
       The unnamed plant is TPG's first pumped-storage project,
       although one necessary, the company said, for the province's
       energy security.
       TPG has identified several of what it calls "favorable" sites
       and will now move ahead on the project's development.
       "This project is our most advanced, has exceptional inherent
       site characteristics and enjoys favorable reception from key
       stakeholders, including the First Nations involved," TPG
       official Peter Bubik said. "We believe the Alberta power market
       provides an economical basis for pumped-storage at this time and
       the market indications are showing increasingly favorable
       economics for pumped-storage in the future."
       Briefly...
       BC Hydro plans to conduct dam safety reviews at three dams:
       22-MW La Joie Dam, 42-MW Seton Dam and Terzaghi Dam, which
       impounds water for two Bridge River generating stations.
  HTML http://www.hydroworld.com/articles/hr/print/volume-33/issue-4/departments/canadian-news.html
       #Post#: 1494--------------------------------------------------
       Re: Dam Hydropower
   DIR By: AGelbert
       Date: July 4, 2014, 11:25 pm
       ---------------------------------------------------------
  HTML http://www.youtube.com/watch?v=uRcEJ8cm9cA&list=TLx2VyfIBIN_nMCgldCi4KyPKcwFnYRTvm&feature=player_embedded<br
       />
       :o ;D HUGE GENERATORS!
       #Post#: 1784--------------------------------------------------
       Re: Dam Hydropower
   DIR By: AGelbert
       Date: August 30, 2014, 4:16 pm
       ---------------------------------------------------------
       Asian bank funds 290-MW Nam Ngiep 1 hydro project in Laos  ;D
       VIENTIANE, Laos
       08/29/2014
       The Asian Development Bank (ADB) has agreed to provide
       assistance totaling US$217 million to support construction of
       the 290-MW Nam Ngiep 1 hydroelectric project on the Nam Ngiep
       River in Laos.
       Japanese construction company Obayashi last year won a contract
       to provide civil engineering works for Nam Ngiep 1 in Xaysomboun
       and Bolikhamxay provinces. The project is being developed by Nam
       Ngiep 1 Power Co. Ltd., which is jointly owned by Kansai
       Electric Power of Japan, Electricity Generating Authority of
       Thailand and Lao Holding State Enterprise.
       ADB is supporting Nam Ngiep 1 under a public-private partnership
       arrangement. The bank is providing an assistance package
       consisting of a US$50 million direct loan, a 3.04 billion baht
       (US$95 million) loan, and a B loan of US$72 million funded by
       the Bank of Tokyo-Mitsubishi UFJ Ltd., Sumitomo Mitsui Banking
       Corp. and Mizuho Bank Ltd., with ADB acting as lender of record.
       The project also will be financed by Japan Bank for
       International Cooperation and four Thai banks.
       The project is to include a main power station, a reservoir of
       67 square kilometers, a re-regulation power station and a
       125-kilometer transmission line to connect to the Nabong
       substation near Vientiane.
       Upon completion in 2019, the project is to supply the bulk of
       its power to Thailand with part of its generation to be used
       domestically to raise Laos' household electrification rate.
       World Bank supports Laos' hydropower, mining sectors
       The government of Laos also signed an agreement in which the
       World Bank is to continue technical assistance under a program
       to build the capacity of Laos' hydropower and mining sectors.
       The World Bank approved US$17.8 million in additional financing
       to the hydropower and mining sectors project.
       With financing from the World Bank's International Development
       Association, Laos' Institute of Renewable Energy Promotion last
       year took bids to become investor-operator of two
       micro-hydropower projects in Laos' Houaphan Province. The World
       Bank's International Finance Corp. also recruited consultants to
       serve as stakeholder engagement/communications specialist for
       the hydropower and forestry sectors in Laos.
  HTML http://www.hydroworld.com/articles/2014/08/asian-bank-funds-290-mw-nam-ngiep-1-hydro-project-in-laos.html
       #Post#: 3166--------------------------------------------------
       Re: Dam Hydropower
   DIR By: AGelbert
       Date: May 18, 2015, 5:41 pm
       ---------------------------------------------------------
  HTML http://assets.panda.org/img/original/hydrosheds_amazon_large.jpg
       Damn Dams: A choking hazard for Amazonia
       A new report by WHRC scientists Marcia Macedo and Leandro
       Castello highlights hydroelectric dam projects in the Amazon as
       a key threat. The report, commissioned by the Living Amazon
       Initiative of the World Wildlife Fund, entitled, “State of the
       Amazon: Freshwater Connectivity and Ecosystem Health” reviews
       the current state of watershed ecosystem health and identifies
       key threats and opportunities for conservation across Amazonia.
       The report finds that planned hydroelectric dam projects will
       constrict every subwatershed and undermine the health of the
       entire Amazonian watershed.
       The health of the Amazon watershed depends on annual flood
       cycles, which cause rivers to swell by as much as 20 meters each
       year. As river water overflows into the floodplains, rivers
       become connected to surrounding forests.
       This annual flood pulse serves as a giant mixing bowl,
       transferring vital sediments and nutrients and providing a
       highway for fish migration. [i]Dam projects sever these
       essential connections, increasingly fragmenting individual
       subwatersheds and undermining the health of the whole Amazon
       system.
       [/i]
       Dams are not the only threat to watershed health. The region
       continues to be at risk from [i]deforestation, mining and
       hydrocarbon extraction, and climate changes[/i], all of which
       may change the annual flood pulse and river connectivity.
       Economic pursuits tend to increase energy demand, which drives
       the construction of more hydroelectric dams in the region. But
       these cumulative impacts are often ignored in environmental
       policies governing dam construction. Environmental impact
       assessments only consider the effects of individual projects,
       making it virtually impossible
  HTML http://www.pic4ever.com/images/2mo5pow.gif<br
       />
  HTML http://www.pic4ever.com/images/swear1.gifto
       achieve integrated
       watershed management.
  HTML http://www.createaforum.com/gallery/renewablerevolution/3-200714183312.bmp
  HTML http://upload.wikimedia.org/wikipedia/commons/0/02/Amazonriverbasin_basemap.png
       The Amazon Basin spans seven nations, which is perhaps the
       biggest challenge to holistic watershed management. Healthy
       river systems depend on connectivity and do not respect
       political boundaries. In many cases, economic development
       activities in one country can incur environmental costs in
       another, yet there is not an overarching policy framework to
       help coordinate management activities across country boundaries.
       Developing such a multinational framework is both the biggest
       challenge and the biggest opportunity for conserving Amazon
       freshwater ecosystems and supporting the productive fisheries
       and human populations that depend on them.
  HTML http://bit.ly/1I3BQJe
  HTML http://whrc.org/news/newsletter/pdf/WHRC_Newsletter_May2015.pdf
       #Post#: 3357--------------------------------------------------
       Re: Dam Hydropower
   DIR By: AGelbert
       Date: June 25, 2015, 4:23 pm
       ---------------------------------------------------------
  HTML http://www.createaforum.com/gallery/renewablerevolution/3-250615171704.jpeg
       UNESCO Small Hydropower Course Participants
       Your Picture Here: Send Us Your Dam Selfie  ;D
       View Slideshow >>
  HTML http://www.hydroworld.com/articles/slideshow/2014/10/presenting-dam-selfies-from-around-the-world.html
       #Post#: 3362--------------------------------------------------
       Re: Dam Hydropower
   DIR By: AGelbert
       Date: June 25, 2015, 7:34 pm
       ---------------------------------------------------------
       --- Quote from: Eddie link ---
       >
       > I have wanted a dam ever since I bought the 'stead.  I know
       right where it should go. I don't really think I'd get enough
       head to drive a turbine very often, but I sure would like to try
       it. The creek is named Mill Creek, and I think that means that
       at some point somebody had a dam that generated water power
       nearby. But so far I have not uncovered the history of the local
       mill that must have once existed.
       >
       --- End Quote ---
       Eddie,
       If your head is too low, there are still ways to get small scale
       hydro power. Forget the math for sufficient head for a moment.
       All you need is 3 or four gallons per minute of MOVING water.
       I think you have that, do you not?
       There are two ways to handle that.
       1. A bullet shaped submersible electric generator is fastened to
       a post in the stream. You then use that electricity to run an
       electric centrifugal pump from the stream to a reservoir.
       2. Skip the electric generator and put a hydraulic ram pump in
       the stream to pump water up to a reservoir. Ram pumps can, with
       very low stream velocity, pump water up as high as 40 FEET!
       This is a 1973 article but the principle involved in hydraulic
       ram pumps is the same. Perhaps they are cheaper now than they
       were then:
       The Hydraulic Ram Pump: Perpetual Motion for the Homestead
       Although water won't run uphill, some exceedingly clever soul
       discovered a long time ago that H2O can be persuaded to pump
       itself in that general direction. The hydraulic ram pump makes
       it possible.
       --- Quote ---
       > ... if your property contains a spring, creek, small stream,
       or other source with a flow of at least three gallons per minute
       (gpm) you can probably solve your problem easily and
       inexpensively with a hydraulic ram pump.
       --- End Quote ---
       --- Quote ---
       >
       > All that time the device has been pumping clear, cool spring
       water up over a 25-foot hill—a distance of 150 feet—and into our
       farm pond, without the use of any fuel whatsoever. In short,
       we're getting about 500 gallons of water per day at an operating
       cost of zero ... and we expect this to continue for ten years or
       more.
  HTML http://www.createaforum.com/gallery/renewablerevolution/3-200714191258.bmp<br
       />
       --- End Quote ---
  HTML http://www.motherearthnews.com/~/media/Images/MEN/Editorial/Articles/Magazine%20Articles/1973/07-01/The%20Hydraulic%20Ram%20Pump%20Perpetual%20Motion%20for%20the%20Homestead/022%20Hebert%20-%20ram%20pump%20diagrams.jpg
       [center]
  HTML http://www.createaforum.com/gallery/renewablerevolution/3-060914180936.jpeg[/center]
  HTML http://www.motherearthnews.com/homesteading-and-livestock/hydraulic-ram-pump-zmaz73jazraw.aspx
  HTML http://www.motherearthnews.com/homesteading-and-livestock/hydraulic-ram-pump-zmaz73jazraw.aspx
       #Post#: 3363--------------------------------------------------
       Re: Dam Hydropower
   DIR By: AGelbert
       Date: June 25, 2015, 8:02 pm
       ---------------------------------------------------------
  HTML https://www.youtube.com/watch?v=xlkuZjd2Frc&feature=player_embedded
       These pumps use ZERO fuel of ANY kind (aside from the energy
       used to make the metal and valves, of course).
       *****************************************************
       Page 1 of 3
   DIR Next Page