URI:
   DIR Return Create A Forum - Home
       ---------------------------------------------------------
       FIRE BUFF PATROL
  HTML https://firebuffpatrol.createaforum.com
       ---------------------------------------------------------
       *****************************************************
   DIR Return to: INCIDENT RUNDOWNS
       *****************************************************
       #Post#: 167--------------------------------------------------
       [FDNYING] Brooklyn 2nd Alarm: 02/20/11 @ 18:15
   DIR By: Diable Fire
       Date: February 20, 2011, 9:14 pm
       ---------------------------------------------------------
       Brooklyn,  N. Y.  02/20/11  @  18:15 hrs.
       East  Flatbush  area
       
       Box   2314
       address:               5755  Kings  Highway   x   Church  Ave.
       
       2314  @  18:10
       Engs.   310,   283,   257
       Lad.  174,    T. Lad.  170
       Batt.  41  s/c
       
       10 – 75 – 2341  @  18:14
       TowerLadder  157   is  designated  as  the   “FAST”   Truck
       Eng.   248
       Rescue  Co.  #2
       Squad  Co.  #252
       Batt.  44
       Division  15
       
       Fire  Building:
       3  Story  Frame   60 x 80  Queen  Anne   P/D
       Surrounding  Properties:
       Exp. #1:   Is  a  Yard
       Exp. #2:   Is  an  alleyway
       Exp. #3:   Is  a  Rear  Yard
       Exp. #4:   Is  a  Side  Yard
       
       All – Hands:
       7 – 5 – 2314  @  18:16
       Batt.  41  reports:     Box  2341,  All – Hands  on  arrival.
       Fire  in  the  basement
       of  a  3  Story  Queen  Anne   Private  Dwelling.      Extra
       Engine  &   Truck.
       Eng.   231   &   Ladder  123   are  s/c
       
       2nd  Alarm:
       2 – 2 – 2341  @  18:18
       Engs.   227,   255,   290
       T. Lad.  120
       Eng.  284  w /  Satellite  3
       Batt.  38   “Safety  Officer”
       Batt.  37   “Resource  Unit  Leader”
       Rescue  Battalion   /   Safety  Battalion
       Fieldcom  1   /   Tactical  Support  Unit  #2
       Command  Tactical  Unit
       
       @  18:22
       Batt.  41:     Box  2314,     We  have  2 – lines  stretched,
       2 – lines  in  operation.
       3rd  line  being  stretched.      Fire  in  the  basement  &
       1st  floor  with  extension
       to  the  2nd  floor.      Primary  Searches   are  being
       conducted  in  the  basement
       and  1st  floor.
       
       @  18:29
       Division  15:     At  Box  2314,    We  have  3 – lines
       stretched,   2 – lines  in  operation.
       Primary  Search  thru  out  is  negative.     Still   Doubtful.
       
       @  18:40
       Fieldcom  1:     Progress  Report  for  the  2nd  Alarm,   Box
       2314,   Division  15  reports:
       3 – lines  stretched,    3 – lines  in  operation.      Main
       body  of  fire  is   knocked  down.
       Secondary  Searches  are  in  progress  thru  out.
       Probably   Will   Hold.
       
       @  18:53
       Fieldcom  1:     Progress  Report  for  the  2nd  Alarm,   Box
       2314,   Division  15  reports:
       3 – lines  stretched,   1 – line  in  operation.     Secondary
       Search  in  the  attic   and
       2nd  floor  is  negative.      Secondary  Search  in  the
       basement  &  1st  floor   are   still
       being  conducted.        Fire   is    UnderControl.
       
       (  Job  Duration:     42 mins.  )
       
       @  19:10
       Fieldcom  1:     Division  15  reports:      Secondary  Search
       of  the  1st  floor  is  negative.
       Secondary  Search  in  the  basement  will  be  delayed  due  to
       a  large  amount  of  debri.
       *****************************************************
       Page 1 of 1