URI:
   DIR Return Create A Forum - Home
       ---------------------------------------------------------
       Erie Canal Neighbors Association
  HTML https://ecna.createaforum.com
       ---------------------------------------------------------
       *****************************************************
   DIR Return to: Perinton/Fairport Canal Community Discussion
       *****************************************************
       #Post#: 1352--------------------------------------------------
       They pulled the drain plug on the Erie Canal - really early!
   DIR By: Michael Caswell
       Date: November 28, 2020, 10:24 am
       ---------------------------------------------------------
       Has anyone noticed how early the NYPA drained the canal this
       year?  It's almost a month sooner than normal, usually just
       after Thanksgiving.
       And just take a look at it today, it's almost bone dry, only a
       couple of buckets worth of water left in it.
       Meanwhile, all along the canal where they have completed the
       EEIP work (chopped the trees & brush down) the canal is FULL!
       This means the NYPA considers the embankment to be SAFELY &
       FULLY RESTORED.
       So, what's going on?
       Mr. Doug K  says, "I heard the canal may stay filled here all
       year long on the western end. Too bad Perinton, Pittsford and
       Brighton sued to keep unsafe embankments from being cleared.
       Those communities can thank the STCC (Stop The Clear Cut Ms Agte
       & Co) for the early canal draining."
       Could it be that this is the first sign of the impending
       restoration of our section of the canal (from Pittsford to
       Fairport)?
       They'd need to make sure there was absolutely no chance of a
       flood, while they do the dangerous work of removing very large
       trees and roots from this particularly steep canal embankment.
       It's all to do with the PHREATIC LINE
  HTML https://eriecanalfacts.wordpress.com/2017/12/20/association-of-state-dam-safety-officials/
       And making sure the soil is completely dry, I'm sure.
       I believe there will be some activity early in The New Year.
       Personally, I am looking forward to seeing the panoramic view of
       all the trees in the valley below. Apparently, in days gone by,
       it was considered quite a feature by the folks on the barges.
       [attachimg=1]
       If you look at the tree line in this photo, (Oxbow Lake) you'll
       see there is quite a noticeable dip in the height of the tops of
       those trees located in the center.
       And on the other side of the embankment, you can see a patch of
       ground which is almost bare of vegetation (Google maps). This is
       the exact spot where the canal breached circa 1912, and I
       believe all the good soil was washed out, consequently the
       vegetation is somewhat stunted.
       Or could it be that the center of the Oxbow Lake Embankment Dam
       is slowly failing and sinking towards an eventual breach &
       flood, that is called a "slump".
       Time will tell which of these has happened.
       #Post#: 1353--------------------------------------------------
       Re: They pulled the drain plug on the Erie Canal - really early!
   DIR By: Doug K
       Date: November 29, 2020, 9:42 am
       ---------------------------------------------------------
       Mike, you are absolutely right on this one... last year there
       was water in your section just about all winter long if I
       remember.
       For the past few seasons the New York State Canal Corporation
       has "de-watered" The Erie Canal in the week after Thanksgiving
       along most of the State. Sometime they might refill to test
       repairs they have made at the start of their winter maintenance
       season. It just might be that the new owners of the NYS Canal
       System are preparing for the Clearing & Rehabilitation of the
       miles of UNSAFE earthen embankments in your area.
       New York Power Authority (NYPA) & the New York State Canal
       Corporation (NYSCC) just might want more time to allow their
       dams to "dry out" before they start driving large equipment on
       the Empire State Canal Trail that is needed for cutting &
       hauling all those trees. They may have learned their lesson from
       the muddy mess they created on the western end trail, when they
       cleared unsafe trees in 2018/2019.
       We are full here, take a look.
       [attachimg=1]
       It could be they will drain the canal this coming week out here,
       but their own Profile Map and past statements may hold another
       clue.
  HTML http://www.canals.ny.gov/navinfo/charts/mileage.jpg
       [attachimg=2]
       Part of the Reimagine the Canals effort (by NYPA & NYSCC) have
       stated they are trying to replenish the natural water supply
       NORTH of the Canal that has been shutoff for the past 200 years
       by the Canal itself. Keeping this western section of the Erie
       Canal full, for a LONGER time, will allow farmers in the area to
       start tapping into canal water many miles away from the actual
       canal itself.
       The Canal Corporation only needs to open existing drain gates
       that will fill local streams & rivers (that cross under or
       through the waterway) to accomplish this simple irrigation task.
       Don't be surprised if the Erie/Barge Canal remains open all year
       long west of Rochester, in an attempt to see if this Canal
       Irrigation Plan is possible and can be sustained without causing
       any winter damage to the waterway.
       Also, don't be surprised if this causes many local businesses to
       change how and where they operate, especially companies like the
       Colonial Belle, who could have a nice place to "winter" their
       ship in Brockport and keep their restaurant service open. All it
       takes is a bubbler system to keep a steel hulled ship in the
       water year round.
       #Post#: 1354--------------------------------------------------
       Speaking of the Phreatic Line - Here's what it looks like
   DIR By: Doug K
       Date: November 29, 2020, 12:26 pm
       ---------------------------------------------------------
       The ECNA posts have mentioned this Phreatic Line quite a bit,
       but to some it might still be a mystery. So I have a couple nice
       pictures to explain it and also show what happens when the
       phreatic line starts to fail on an embankment dam. These
       pictures & videos are taken in my own backyard which has a 20
       foot tall leaking canal embankment in the eastern corner of our
       two acre lot.
       Go to this webpage to see a great  explanation of the Phreatic
       Line -
  HTML https://ecna.us/canal-facts/the-embankment-dam-phreatic-line-where-the-water-goes/
       Basically all earthen dams work the same way. They leak LOTS of
       water from the water-filled side of the dam, through all of the
       earth used to build the embankment. Dam Leaking starts BELOW the
       waterline of the impounded water, and will eventually leak away
       at the base of the earthen dam known as the Toe of Slope. Along
       the Erie Canal any embankment that is about 16-18' tall should
       have water coming out where the outside slope of the earthen dam
       meets the original level ground.
       Most places along the Erie Canal embankment collect this leaking
       water in a ditch called the Toe Drain. This drain carries
       leaking canal water back into culverts or creeks and into the
       general aquifer system. After awhile the lower sections of all
       earthen dams become so saturated that the top soil becomes full
       of water and can't even take even a normal rainfall. All of this
       water will eventually find it's way into these Toe Drains.
       Normally the leak is very slow, like in the image below that
       shows a 20' tall dam section with a leaking Phreatic Line.
       There are three marked leaks in this embankment and all 3 leaks
       are located about 24-30" above the bottom floor of the canal. If
       you look across the pink marked stakes that were placed in this
       section, by the NYS Canal Corporation in 2019 during their first
       canal inspection in 75 years, you will note that this leak is
       about 25-35 feet long as well.
       In 2019 the NYS Canal Corporation Embankment Restoration Project
       removed trees that had died on the embankment and were over 80
       feet tall. This leak is most likely caused by old roots and
       piping that is now moving water along old dead roots and that
       water has breached out of it's normal Phreatic Line.
       [attachimg=1]
       [attachimg=2]
       So there you have it, a brief explanation of the Phreatic Line
       and why it's critical to be able to see if it's working
       properly.
       This Phreatic Line in this section if dam is compromised and is
       now being monitored by the NYS Canal Corporation to see if flow
       eventually slows. If it gets worse, there are ways to insure the
       embankment will not break using steel barrier walls.
       The most important part of any Erie Canal Embankment is most
       likely this "unseen" part that can cause an entire dam to
       collapse if not maintained properly or identified with line of
       sight inspections. Those inspections are IMPOSSIBLE to perform
       with canal embankment covered with trees & underbrush, which is
       why the Canal Corporation has now undertaken a new Embankment
       Integrity Program to clear these old dams, and perform proper
       inspections to identify more leaks like these three.
       Here's our leak when it's full and ready to become our winter
       skating pond.
       [attachimg=3]
       Our canal leak went "unclaimed" for 20+ years, while the NYS
       Canal Corporation denied it was "their water" flooding our yard.
       Once the NYS Canal Ownership changed in 2017, to the New York
       Power Authority, the new owners have not only taken ownership of
       this leak, they have also cleared 27 miles of other leaking
       canal embankment sections, that are keeping many canal neighbors
       in danger.
       These new owners, NYPA,  seem to be putting Erie Canal Safety &
       Sustainability, and the safety of Canal Neighbors FIRST on their
       list, which is a welcome change for many neighbors who have
       complained about overgrown embankments and leaky water for years
       and have gone unheard until now.
       It is no secret that the amount of active Erie Canal leaks being
       monitored by the NYSCC, since they have started their Embankment
       Integrity Program, has grown five-fold. Those leaks are now
       being monitored, and corrective action can be taken, if and when
       needed, to avert a catastrophic flood in many areas west of
       Rochester. Many leaks like this are still undetected and growing
       worse over time. Each has the potential to be the next Erie
       Canal disaster that makes the National News cycle
       There are still 100 miles of unsafe canal embankments that still
       need to be cleared though, many in the towns & villages that
       fought to stop the canal embankment work in their own
       communities. Those people who stopped the Embankment Integrity
       Program said they were doing it for the good of the public.
       Sadly they didn't hear the words of the OWNERS of the Erie
       Canal, who was saying the exact same thing, the embankments were
       being cleared for the SAFETY of the Public.
       Time will tell who was correct... those who wanted to run a
       Public Safety Program on the Erie Canal or those who chose to
       stand in the way of Erie Canal Safety and fought to keep these
       leaking embankments from being cleared, and having all these
       leaks discovered and repaired.
       Maybe want to ask yourself which side of that decision YOU want
       to be on?
       *****************************************************
       Page 1 of 1