URI:
   DIR Return Create A Forum - Home
       ---------------------------------------------------------
       Erie Canal Neighbors Association
  HTML https://ecna.createaforum.com
       ---------------------------------------------------------
       *****************************************************
   DIR Return to: Erie Canal & Embankment Dam Integrity
       *****************************************************
       #Post#: 886--------------------------------------------------
       Is the Canal Corporation Lying about Embankment Integrity? See
       Dams 1- 4
   DIR By: Doug K
       Date: January 8, 2020, 6:49 pm
       ---------------------------------------------------------
       In the end it all comes down to facts... and what we see vs what
       we hear.
       The NY Canal Corporation started clearing what they termed as
       "Unsafe Embankment Dams" in our area as part of a Project called
       EERP, the Earthen Embankment Restoration Project. It started
       from the Western end of the main Erie Canal in Buffalo and
       worked it's way to Brockport. The NYCC was very exact about what
       they wanted to fix, spoke with the public about their plans in
       several meetings and outlined why this embankment clearing work
       needed to be done.. they stated:
       1) There were Earthen Dams under all those trees lining the Erie
       Canal in our area...and those dams were Unsafe.
       2) The hidden Earthen Dams were being damaged by the woody
       overgrowth and this type of covering was not allowed on dams of
       this type
       3) Many of these Earthen Dams were nearing 100 years old & had
       never undergone a proper earthen dam inspection
       4) Neighbors of the Erie Canal, living below the dams, were in
       danger of potential flood due to embankment breaching if the
       trees remained.
       Now some people believed the Canal Management & Project Leaders,
       and some did not. Some worked with the Canal Corporation on
       "good faith" thinking they would not be untruthful about Public
       Safety, and some folks scoffed at safety and have worked against
       the Embankment safety work from Day #1. But the real proof is is
       what was said and whether or not it really was the truth.
       The New York Canal Corporation submitted a package that included
       a number set of work zones... that we now know are Earthen Dams.
       [attachimg=1]
       They also had how large the clearing work would be and the State
       Safety Level Risk Rating (SLRR) for each Embankment.
       [attachimg=2]
       They included Maps for these unsafe dams that needed repair
       [attachimg=3]
       And when they started to clear the embankments off low and
       behold...they DID find that there were Earthen Dams underneath
       all that woody vegetation. Here's a section of Dam #37 just East
       of the Village of Brockport where houses within 50' of the Top
       of the Dam were virtually invisible. Dam 37 is approximately 1.5
       miles long with heights of 18-22 feet above neighborhoods to the
       North
       [attachimg=4]
       So as you can see the NY Canal Corporation was spot on with
       their assessment of the Public Safety Nightmare the Erie Canal
       had become.
       But some still ignored the warnings and stopped the progress of
       the original EERP Project... but NOT before about 40 Dams were
       cleared. Those dams are listed on their original project task
       list, along with about a dozen dam zones that were moved to the
       new Earthen Embankment Integrity Program. That new program will
       look at clearing BOTH sides of the waterway and it's apertunate
       structures, for the entire length of the system...regardless of
       if the embankment is raised or landcut. Tree clearing is going
       to happen for the sake of public safety along the canal trail,
       and the safety of those living below the earth dams sections.
       I will document these original 40 EERP Dams in this post..
       starting at Dam # 1 just west of Medina, near the old Fruit Ave
       "Lowbridge" crossing. If nothing more it gives EACH of you a
       chance to see what Earthen Dams are supposed to look like, and
       proves those original f safety points made by the Canal
       Corporation...
       It's about Inspection & Safety at the end of the day, regardless
       of what some may say or think about Erie Canal Embankments
       #Post#: 887--------------------------------------------------
       Submitted for Inspection... EERP Dam #1
   DIR By: Doug K
       Date: January 8, 2020, 7:00 pm
       ---------------------------------------------------------
       Dam number 1 is listed as one of the smaller sized dams in
       area.. but it's steep enough and about 25-28' tall... and it has
       a hole in it.. a culvert.
       It's listed on the Canal Project as a Moderate Safety Level and
       actually has been cleared to move the safety rating back to LOW
       or None on next inspection. The culvert, which lets a small
       stream pass under the canal, is accessible to inspect as you can
       see by the pictures. It looks great, but I have no before
       pictures to show... maybe others do.
       [attachimg=1]
       VIEW from the WEST END of Dam
       [attachimg=2]
       VIEW at the CULVERT
       [attachimg=3]
       VIEW from the EAST END of Dam
       (Note the access to culvert)
       [attachimg=4]
       EZ CULVERT INSPECTION
       So you have seen the pictures...you answer the questions
       1) Is it made of Earth?
       2) Is it a Dam?
       3) Is it now covered with the correct vegetation?
       4) Can proper Dam Inspections be performed?
       Yes, Yes, Yes, and Yes.
       If you can't see the truth with this one...keep going, there are
       many more examples coming
       #Post#: 888--------------------------------------------------
       Submitted for review... Dam #2
   DIR By: Doug K
       Date: January 8, 2020, 7:08 pm
       ---------------------------------------------------------
       Dam was was a highlight compared to Dam #2... rather boring,
       longer than #1, not nearly as steep but just as high. And the
       common denominator for Embankment Safety... there were several
       houses or neighborhoods located below the dam. The top of the
       water when the canal is full is about 20' above the roofs of
       these houses.
       [attachimg=1]
       VIEW from the WEST END of the Dam
       [attachimg=2]
       VIEW from the CENTER of the Dam
       (Note the houses through the trees)
       [attachimg=3]
       VIEW from the EAST END of the Dam
       So two cleared EERP work zones, two water impounding structures
       that certainly qualify as Earthen Embankments Dams. Obviously
       more inspection friendly than when they were covered with trees,
       and as you can see... Erie Canal Neighbors who now have SAFE
       dams bordering their properties instead of flood hazard,
       overgrown, dangerous embankments.
       But there is more... Dam #3 only has been halfway cleared...take
       a look
       #Post#: 889--------------------------------------------------
       Earthen Embankment Restoration Dam 3 - A Tale of Two Dams
   DIR By: Doug K
       Date: January 8, 2020, 7:25 pm
       ---------------------------------------------------------
       Dam 3 of the original Embankment Project sits right next to Dam
       #2 which ran from Fruit Ave to the West. On the east side of
       this old canal bridge crossing is where Dam Three starts. It has
       been cleared at the very beginning and at the very end, both
       done for vary different reasons I'm sure. It's a fairly long
       embankment dam at 3300 ft, about 2/3 mile. It runs between Fruit
       Ave & Marshall Rd High Bridge.
       The western end of Dam 3 is actually now the front yard of an
       ORIGINAL Erie Canal side home built in 1833, called the
       Servoss-Hagood House. It's a nice place, well worth a peek and
       may already have been cleared before this project was done.
       [attachimg=1]
       VIEW of the House at WEST end of Dam 3
       [attachimg=2]
       Historic Home Marker
       Now moving east from the house the Dam becomes overgrown &
       untouched by any restoration work. It's also noted that there
       are no other houses along this section, only a wet area due to
       another culvert located midway down Dam #3. Note that the
       culvert itself was cleared, on both sides, and the next post
       will show a new cleared Dam Inspection Path to allow proper
       Culvert and Toe of Slope Inspections
       [attachimg=3]
       UNCLEARED Dam 3 at West End
       [attachimg=4]
       CLEARED Dam 3 Culvert
       The next post in this thread will show the rest of Dam #3
       #Post#: 890--------------------------------------------------
       Embankment Restoration Dam 3 - A Tale of Two Dams (cont)
   DIR By: Doug K
       Date: January 8, 2020, 7:33 pm
       ---------------------------------------------------------
       We left off at the Culvert under Dam 3... and that nice new
       Inspection Path. I didn't walk down it, due to limited time and
       intermittent snow squalls, but did get a few good pictures. Most
       likely any uncleared sections along Dam 3 will become part of
       the new Canal Corporation Embankment Integrity PROGRAM that will
       fill in the blanks on Erie Canal safety, by making any and all
       areas along this NY State asset open to safety related earthen
       dam work, at the discretion of the Canal Corporation workload
  HTML http://www.canals.ny.gov/Earthen_Embankment/index.html
       Here's the rest of Dam 3 Pictures
       [attachimg=1]
       UNCLEARED East End of Dam 3
       [attachimg=2]
       Dam 3 Culvert Inspection Path
       Now about halfway down Dam 3 from the 1833 house the rest of Dam
       3 borders a rather large farmer's field and is cleared from here
       to the next overpass bridge at Marshall Rd
       [attachimg=3]
       CLEARED eastern section of Dam 3
       [attachimg=4]
       Dam 3 leads directly to Dam #4 which is one of the largest,
       longest and also one of the most unsafe in the entire original
       Embankment Restoration Project... see the next post
       #Post#: 891--------------------------------------------------
       Embankment Dam Restoration in Medina - Dam 4
   DIR By: Doug K
       Date: January 8, 2020, 7:47 pm
       ---------------------------------------------------------
       Dam 4 has a HIGH RISK Rating for Dam Safety, it is 7.5 acres of
       embankment, and is a continuous earthen embankment dam for 1.5
       miles from Marshall Rd High Bridge to Medina Main St Lift
       Bridge. It was too long to walk the whole thing today due to
       weather, but I did get three nice pictures to share. It's long,
       has a couple culverts by the look on Google Maps and is about
       16-20' tall so the entire canal, top to bottom, is above the
       ground level of surrounding areas.
       [attachimg=1]
       Dam 4 Western End
       [attachimg=2]
       Dam 4 showing size
       [attachimg=3]
       Dam 4 EAST end in Medina at Main St Lift Bridge
       Maybe Dam 4 was marked High Hazard due to the trees that used to
       be there, and it's size. In any case it is CLEARED...do you
       think it qualifies as a Dam?
       *****************************************************
       Page 1 of 1