URI:
   DIR Return Create A Forum - Home
       ---------------------------------------------------------
       Erie Canal Neighbors Association
  HTML https://ecna.createaforum.com
       ---------------------------------------------------------
       *****************************************************
   DIR Return to: Earthen Embankment Restoration Discussion (EERP)
       *****************************************************
       #Post#: 542--------------------------------------------------
       Erie Canal Embankment Restoration is almost complete in
       Brockport
   DIR By: Doug K
       Date: May 1, 2019, 8:33 am
       ---------------------------------------------------------
       Final stages of the embankment restoration in Brockport are
       being performed. Topsoil is being dumped, followed by a
       spreading operation and then slope smoothing. All of this in
       preparation for the grass seed mixture that will be hydroseeded
       sometime in the next few days...
       [attachimg=1]
       Here's a video of the topsoil going down
  HTML https://drive.google.com/open?id=1FAEPFN8L5CfexJu8_BLap1-gbb9Ic9Ai
       Next step is grading and prep for grass
       [attachimg=2]
       [attachimg=3]
       Video of the topsoil grading and slope prep
  HTML https://drive.google.com/open?id=1BCow5EvGeJ_gSZVBzMJE13Ye5LA4C36R
       Erie Canal is starting to fill again, the 2019 navigation season
       is just about here.
       *****************************************************
       Page 1 of 1