       Exactly what is a SEQR Review and why does it matter to the EEIP
       Program
   DIR By: Doug K
       Date: March 13, 2019, 12:57 pm
       ---------------------------------------------------------
       There's been a enough talk about this State Environmental
       Quality Review or SEQR as it's known by, to create it's own
       forum subject on the Erie Canal Neighbors Association website.
       Some people used the SEQR Act to stop the EERP project that was
       dedicated to public safety, it's not a process to be taken
       lightly. Here's what the SEQR Act is all about in New York
       SEQR Introduction:
  HTML https://www.dec.ny.gov/permits/6208.html
       SEQR Process Flow Map:
  HTML https://www.dec.ny.gov/permits/32521.html
       Seems the real issue at hand was whether the NY Canal
       Corporation was correct in their declaration that the Canal
       Embankment Restoration Project was a "maintenance activity on a
       flood control structure (ie:dam) or were they arbitrarily
       clearing "open land".
       The Canal Corp said the SEQR was a Type 2  which did not require
       a full SEQR Environmental Impact Statement Form completion, some
       folks in Town of Brighton, Pittsford & Perinton thought
       differently and convinced a Court to halt work there until a
       full SEQR could be done. So the NY Canal Corp took the cue, and
       cut these three towns off the original project plan, and also
       started their new PROGRAM supporting Embankment Integrity &
       Safety.
       So how does SEQR work and what does this EIS form look like?
       It was tough, but I condensed the 37 pages of the EERP SEQR
       forms to three pictures I will share here. SEQR uses several
       form, sectioned into neat little parts, to help the person
       reviewing the location or area being worked on, think about what
       is occurring there. It's a checklist of sorts that focuses your
       thought on key areas to help understand the impact of the work
       on the surrounding environment.
       SEQR seems to cover just about everything that could happen or
       be seen in work of this kind. Here's the 3 Main parts of the
       SEQR process, starting with Part 3 first, that is the
       Environmental Impact Statement that is the GOAL of the whole
       SEQR effort.
       [attachimg=1]
       PART 1 of SEQR:
       This section defines the actual work to be done and a
       description of the area around it. It sets the sage so to speak
       for Part 2
       [attachimg=2]
       PART 2 of SEQR:
       This section covers 18 different areas of concern to consider
       when doing the work outlined in Part 1, it's the nuts and bolt
       of the SEQR analysis. This is where the determination is made of
       impacts to everything from land to animals to humans. It looks
       at the time during the work, while also considering the long
       term affects of the work being done.
       [attachimg=3]
       So you know, there are sections in the SEQR documents specific
       to Dams, Wetlands, Pollution & Privacy, it leaves no stone
       unturned. And now it is required on the new EEIP Program moving
       along the rest of the 260 miles of Erie Main waterline still
       left to do. There are still about 90 miles of Earthen
       Embankments still left to address with the new Embankment
       Integrity Program... and "missing" SEQR will not be an issue
       Since the SEQR was done "post large vegetation removal" in the
       EERP project the NY Canal Corp took a "restoration" approach,
       deciding to replant barriers (per what would have been SEQR
       requirements) and as desired by the neighboring property owners.
       Mostly this SEQR re-screening requirement falls under Sections 9
       & 15 of SEQR Part 2.
       And for those keeping score... the New York Canal Corporation
       was RIGHT about not needing the SEQR Form Statement as their
       assessment that Embankment Remediation is a Type 2 action was
       verified by NY DEC in October 2018.
  HTML https://www.dec.ny.gov/enb/20181031_not8.html
       Type II actions:
       Type II actions listed in the statewide and agency SEQR
       regulations are determined not to have a significant adverse
       impact on the environment. Some examples:
       1) rebuilding or replacement of facilities, in kind, on the same
       site
       2) minor structures, such as garages, barns or home swimming
       pools, routine permit and license renewals with no substantial
       change in permitted activities
       3) construct or expand either primary or accessory
       nonresidential structures in an appropriate zone with less than
       4,000 square feet of gross floor space construct or expand a
       single, two or three family residence on approved lot
       4) routine activities of educational institutions, including
       expansions of existing facilities by less than 10,000 square
       feet
       nondiscretionary (ministerial) approvals
       5)maintenance and repair activities
       6)emergency actions
       7)actions of the New York State Legislature and the Governor or
       of any court enforcement actions
       8)actions subject to environmental review under the Adirondack
       Park Agency or Public Service Laws.
       *****************************************************