URI:
   DIR Return Create A Forum - Home
       ---------------------------------------------------------
       Erie Canal Neighbors Association
  HTML https://ecna.createaforum.com
       ---------------------------------------------------------
       *****************************************************
   DIR Return to: Just the Dam Facts! - Embankment Reference Material 
       *****************************************************
       #Post#: 222--------------------------------------------------
       Thatching!  It's over 5000 years old!
   DIR By: Michael Caswell
       Date: December 23, 2018, 4:08 am
       ---------------------------------------------------------
       Man has used thatching to protect him from the elements for a
       very long time. It's a well proven method of shedding water from
       a structure, so when you apply that thinking to The Great
       Embankment, it makes sense.
       Looking at the problems with embankments, it's easy to realise
       that too much moisture can be devastating for these slopes if
       they become too saturated.
       A Phreatic Line where moisture from the canal itself soaks
       through the fill of the embankment wall is quite acceptable as
       long as the liquid can escape below the toe of the slope.
       However, if the drier material above the Phreatic line becomes
       saturated too, then there is an increased risk of a slide.
       Grass growing on an embankment is like a thatch, it sheds the
       rainwater down the slope, keeping the bank dry. It's the obvious
       choice for a low maintenance protective covering.  A grass
       covering also makes it easy to spot nefarious woodchucks at
       work!
  HTML https://upload.wikimedia.org/wikipedia/commons/8/81/Pub.williams.arp.750pix.jpg
       #Post#: 248--------------------------------------------------
       Re: Thatching!  It's over 5000 years old! Still being used on
       the Erie Canal
   DIR By: Doug K
       Date: January 3, 2019, 7:05 pm
       ---------------------------------------------------------
       Mike,
       I waited to post this reply...knew the real "thatching" was
       coming along soon. Those straw thatch mats being placed atop the
       repaired root pulls are now all neatly joined together with
       still another Process Step in the Earthen Embankment Remediation
       Project. Today a straw "cannon" was slowly pulled along the Erie
       Canal Trail with 3 operators aboard and one driver maintaining a
       constant slow speed.
       One person pulled straw bales and fed the loading chute to the
       Thatch Cannon. Another person cut & removed the bales cords and
       pushed the bale into the chamber where it was shredded and
       blasted out. The person manning the cannon itself had to "play
       the wind" as each gust did play a role in where the straw thatch
       landed.
       I'm sure someone in the STCC will post about how it was messy
       and loud... but from my vantage point, ringside, it was fast and
       efficient. They have about a 2 mile long by 22' average height
       section of Earthen Dam in Zone 37 and this looks like the last
       step before more topsoil, grading and grass planting come next
       Spring.
       Here's some pictures... and a nice Before & After at the end.
       Thatch Cannon - Shooting Straw Thatch about 30-40'
       [attachimg=1]
       Here's what the Brockport East Dam looks like after this step of
       the EERP Process
       [attachimg=2]
       And voila.. the Embankment is now ready for the final steps of
       add topsoil & contouring then the hydroseed..and most likely we
       will see the Straw-Thatch Cannon again.
       [attachimg=3]
       #Post#: 251--------------------------------------------------
       Re: Thatching!  It's over 5000 years old!
   DIR By: Michael Caswell
       Date: January 3, 2019, 8:50 pm
       ---------------------------------------------------------
       A great operation. Not exactly what I was portraying in my
       thatch theory, because I think this operation is more of a
       mulch. It's temporary, but never the less, it's function is
       similar. It sheds the rainwater, stopping the soil from being
       eroded and washed away.
       In the Spring, grass seeds will be spread on this mulch and
       grass will grow. When this happens, the grass will provide a
       permanent thatch.
       #Post#: 252--------------------------------------------------
       Re: Thatching!  It's over 5000 years old!
   DIR By: Doug K
       Date: January 4, 2019, 9:34 am
       ---------------------------------------------------------
       Actually this layer of straw mat & blown thatch combination is
       the middle of the Embankment repair sandwich. From what we've
       heard there is more topsoil to come that will cover & recontour
       the outboard slopes, of many dam sections, to have the final
       outboard dam slope something less steep and easier to maintain.
       In the end the Embankment will look like this if you did a
       Before & After cross-section.
       [attachimg=1]
       I've heard that some embankment sections will get as much as 24"
       more of topsoil, which made me think about how much dirt might
       be needed... big numbers usually turn more heads.
       For a typical property width of 100' and the EERP Phase 2
       western zone embankment sizes... seems 30' width outboard slope
       seems close to average. That would mean about 222 yards of
       topsoil to go 24" deep. What get's amazing is when you take that
       out to the EERP Phase 2 current work, about 32 miles of
       Embankment Dams between Lockport & Spencerport. Here's a look at
       the Topsoil Calculator for that equation.
       Wow, over 10 million cubic feet of topsoil will be needed,
       that's about 375,000 cubic yards. Typically, dump trucks haul
       10-14 yards per load, so this is about 31,250 dump truck loads
       for the 32 miles of EERP Phase 2 work underway. And there is
       still another 10 or so miles to do in Brighton, Pittsford, and
       Fairport.. so another 10-12 thousand loads there. That may be
       light as the Embankment Dams east of Rochester are much taller
       and have longer Outboard Slopes to reshape.
       [attachimg=2]
       Can't help but notice that these EERP Constructions Companies
       are also trying to source materials locally when possible &
       practical. Hopefully this means our local topsoil providers will
       all be bust come Springtime.
       We are not quite mid-point of EERP Phase 2 in Brockport, the
       safer Embankments are taking shape, and hopefully we start
       discussions soon with the Arborist who will be working with
       homeowners who need evergreen barriers constructed. Many
       homeowners are still hoping to reduce the Erie Canal Trail
       visibility into our personal lives, for some of us there is zero
       separation now between Erie Canal National Heritage Corridor
       patrons and our dinner tables.
       Quite a Transformation so far:
       [attachimg=3]
       *****************************************************
       Page 1 of 1