       #Post#: 2533--------------------------------------------------
       Still more Earthen Embankment Repairs in the Towns of Royalton
       & Spencerport.
   DIR By: Doug K
       Date: March 15, 2024, 9:59 am
       ---------------------------------------------------------
       From the new Canal Corporation Trail Advisory & Integrity
       webpage, more safety work to remove "danger trees" that are
       putting Trail Users at risk, as well as boaters & those living
       along the Erie Canal waterways.
  HTML https://www.canals.ny.gov/trails/projects.html
       [attachimg=1]
       #Post#: 2540--------------------------------------------------
       Re: Erie Canal Trail Safety Work Continues in Glens Falls
   DIR By: Doug K
       Date: March 23, 2024, 7:10 am
       ---------------------------------------------------------
       And it appears that one trail repair job has created work &
       added traffic on another section of trail, this announcementout
       this week on the NYCC Trail Integrity webpage
       [attachimg=1]
  HTML https://www.canals.ny.gov/trails/projects.html
       #Post#: 2546--------------------------------------------------
       Re: Erie Canal Trail Safety Work Continues in Rome & Oneida
       County as well.
   DIR By: Doug K
       Date: March 28, 2024, 9:46 am
       ---------------------------------------------------------
       Many around Monroe County may believe the New York State Canal
       Corporation has stopped its efforts to clear canal embankments
       and repair that aging earthen dam PROBLEM they have had for the
       past 9 years.
       Untrue, in fact Embankment Stabilization efforts are on-going
       through the NYS Canal System across the state, all part of the
       overall EEIP public safety program.
       Ever since the release of the Earthen Embankment Integrity
       Program (EEIP) documents on the NYSDEC website, there's been a
       steady effort to finally identify and fix these old earthen
       embankments by clearing, removing tree roots and restoring
       proper slope angles to these 100-year-old dams.
  HTML https://dec.ny.gov/news/environmental-notice-bulletin/2022-11-30/public-notice/statewide-the-new-york-state-canal-corporation-as-lead-agency-has-accepted-a-final-generic-environmental-impact-statement-on-the-proposed-earthen-embankment-integrity-program-eeip-the-final-geis
       The action involves implementing a documented comprehensive
       canal system embankment maintenance program to restore,
       maintain, and manage the integrity of embankments within the
       Canal System. The EEIP will address implementation of management
       practices for water impounding earthen embankments or features
       that abut and are parallel to the earthen embankments, including
       engineered alternatives to minimize or mitigate environmental
       impacts, but may not include individual structures located along
       the embankments or under the embankments (spillways, waste
       weirs, vertical walls, culverts and dive culverts are excluded
       features).
       Specifically, the scope includes all embankment material and
       impairments along with turf, vegetation, armoring or paving
       that's parallel to the embankment slopes and surfaces from
       outside the toe of the outboard slope of the canal or feeder to
       the toe of the inboard embankment slope. It includes water
       recording and management features used in regulation of water
       levels in the canal and feeders, and geotechnical
       instrumentation devices. It also includes design and
       implementation of certain alternative solutions to vegetation
       removal, as well as amenities such as supplemental compatible
       vegetation.
       The project is located in the counties of Albany, Cayuga, Erie,
       Herkimer, Madison, Monroe, Montgomery, Niagara, Oneida,
       Onondaga, Ontario, Orleans, Oswego, Rensselaer, Saratoga,
       Schenectady, Seneca, Warren, Washington and Wayne, New York.
       Contact: James Candiloro, New York State Canal Corporation, 30
       South Pearl Street, Albany, NY 12207, Phone: (518) 433-6841,
       E-mail: James.candiloro@nypa.gov.]
       Here's another ENB from the New York State DEC, for embankment
       work near Rome, NY.
  HTML https://dec.ny.gov/news/environmental-notice-bulletin/2022-08-24/completed-application/canalway-trail
       Project Description:
       The applicant proposes to repair the embankment and stabilize a
       trail section of the Erie Canal Trail, approximately 2,200 feet
       west of Thomas Rd.  The proposed repair incorporates the
       placement of medium weight stone fill on top of Type-1 stone
       bedding material. The stone fill will be keyed-in at the toe of
       slope to prevent future slippage.  A total of 38.8 cubic yards
       of material over 622 square feet will be placed in NYS
       Freshwater Wetland OR-25.  A total of 705 cubic yards of fill
       over 8,930 square feet will be placed in the Regulated 100-foot
       Adjacent Area of NYS Freshwater Wetland OR-25.
       And another Environmental Notice Bulletin for work in Oneida
       County
  HTML https://dec.ny.gov/news/environmental-notice-bulletin/2023-03-01/seqr/oneida-county-the-new-york-state-canal
       Oneida County - The New York State Canal Corporation, as lead
       agency, has determined that the proposed Vegetation Removal from
       Upland Disposal Site 4-40 will not have a significant adverse
       environmental impact. The action involves the vegetation
       removal.
       So what's different NOW than before, when the Earthen Embankment
       Integrity Program cleared & stabilized 28 miles of embankments
       between 2018-2021 in Orleans & Monroe County?
       The only thing different, at least from what the ECNA can
       determine...
       Nobody else, no other County or Town in NYS looked at this Erie
       Canal vegetation removal & embankment/trail repair work as a
       "existential threat" to those who use the Canal  System.
       ONLY the Town of Perinton, in Monroe County, felt "proud" to
       stand up against this public safety program.
       They were joined by a handful of Facebook people who also denied
       this work was for public safety, they were in the Town of
       Murray, Orleans County, around Holley, NY.
       So lesson learned, hopefully for the NYSCC... keep your head
       down, stay on course with your EEIP efforts, and leave Monroe
       County to the very END of the program.
       Hopefully by then, those who still think protesting public
       safety work in the the "name of the environment", will have
       figured out how stupid that idea sounds... to anyone.
       #Post#: 2568--------------------------------------------------
       Still more Earthen Embankment Repairs in the Towns of Royalton
       & Spencerport.
   DIR By: Doug K
       Date: May 22, 2024, 7:01 am
       ---------------------------------------------------------
       It's OFFICIAL folks, the NYC Canal Corporation Program to
       Identify & Repair Earthen Embankments is alive & well once again
       in 2024. More repairs being made to the unsafe, aging canal
       structure in Royalton, once again. It appears to be in the same
       area noted by the Canal Authority as a "problem" back in 2018,
       and 2020.
       The work notice came up on the NYS Canal Trail Project webpage,
       hopefully this doesn't bring out more of those "save the tree"
       denialist from Facebook, saying something stupid like "there's
       nothing wrong with the Erie Canal, it's fear-mongering".
  HTML https://www.canals.ny.gov/trails/projects.html
       [attachimg=1]
       The ONLY thing that Erie Canal neighbors & communities should
       fear is a group of people who have done nothing but minimalize
       the public safety issues in New York State caused by a 200 year
       old waterway.
       #Post#: 2569--------------------------------------------------
       Re: AND Still more Earthen Embankment Repairs in the Village of
       Spencerport
   DIR By: Doug K
       Date: May 26, 2024, 6:46 am
       ---------------------------------------------------------
       And yet another NYS Canal Corporation announcement of EMBANKMENT
       REPAIRS in the Village of Spencerport, this one is for adding
       NEW filter blankets to the earthen dams along the Empire Trail
       on the north side of the waterway. The trail will be
       intermittently closed while dam repairs are underway, next week.
       You can read about on the NYS Canal Corporation webpage
  HTML https://www.canals.ny.gov/trails/projects.html
       [attachimg=1]
       So what's the purpose of a Filter Blanket on an earthen dam,
       like those along the Erie Canal?
       That's simple, to stabilize weak & unsafe seepage conditions
       along the earthen structure, here's an explanation from experts
       in this area:
       The occurrence of cracks in earthen dams, due to hydraulic
       fracturing or differential settlement, can have serious
       consequences and might even lead to its collapse. Soil filters
       and drainage blankets are necessarily provided in earthen dams
       for safeguarding the stability of the dam against
       seepage-induced flow through the dam body
  HTML https://ui.adsabs.harvard.edu/abs/2022JIEIA.103..215T/abstract#:~:text=Soil%20filters%20and%20drainage%20blankets,core%20and%20the%20downstream%20shell.
       So much for that Fairport "social media theory" that "nothing is
       wrong with the Erie Canal... nothing could be further from the
       truth.
       I'm quite sure that NY State is not spending millions of dollars
       to repair this section of earthen dam in Spencerport on a whim,
       or for any other reason than protecting public safety, and the
       integrity of New York States oldest & most important historical
       asset, regardless of what some on Facebook might be claiming.
       The Canal Corporation Project Website is getting busy these
       days, with three working repairs noted TODAY alone, all centered
       on Earthen Embankment Integrity Program work. And the list of
       operational issues plaguing the NYS Canal System these days is
       getting quite long as you can see by the image below, from their
       Canal Notice Webpage. Take a look at the list of Canal Issues,
       from inoperable locks & lift bridges to lower water levels
       (again) and floating debris (again).
       The list of Canal Issues will grow even longer as the season
       continues, does anyone still want to say there's nothing wrong
       with the  NYS canal system?
       [attachimg=2]
  HTML https://www.canals.ny.gov/wwwapps/tas/notices/index.aspx
       #Post#: 2606--------------------------------------------------
       Re: Earthen Embankment Repairs in Royalton Extended by another
       3/4 mile
   DIR By: Doug K
       Date: July 16, 2024, 8:17 am
       ---------------------------------------------------------
       It appears that a half mile REPAIR of the Erie Canal Embankment
       in Royalton has not been enough to stop the persistent seepage
       issues there.
       The NYS Canal Authority has just announced the need to extend
       the slurry-bentonite cutoff wall by 4000', that's about 3/4 mile
       longer than first announced.
       For those who claim on social media that repairs to Erie Canal
       Embankments is part of a "safety fear-mongering" by New York
       State, this should be a wake-up call to how wrong that idea &
       those statements are. The Canal System is broken, and has become
       a safety issue that WILL cost NY State many millions of dollars
       to repair.
       There is NO option but to fix it now, before NYS becomes the
       site of next flood tragedy making the National News circuit.
       Here's the main headline:
       The New York Power Authority (NYPA) and New York State Canal
       Corporation today announced that a construction project to
       address persistent seepage along the Erie Canal’s earthen
       embankment in the Town of Royalton, Niagara County has been
       extended. During the Fall of 2023, the Canal Corporation and its
       contractors installed a soil-bentonite slurry wall along a
       one-half mile stretch of the earthen embankment underneath the
       centerline of the Erie Canalway Trail between Wruck Road and
       Peet Street.
       Funding to extend the project by 4,000 feet was included in the
       FY 2025 Enacted Budget. The budget allocated $50 million to the
       Canal Corporation for high-priority infrastructure needs
       including the rehabilitation of water-impounding structures that
       have been in service for more than a century.
       “I applaud Governor Hochul and the State Legislature for
       prioritizing funding in this year’s budget for critical canal
       infrastructure,” said New York Power Authority President and CEO
       Justin E. Driscoll. “While NYPA continues to strategically
       invest in the 524-mile New York State Canal system, this funding
       from the State is an important step to ensure the canal’s
       longevity and to safeguard many of the communities located along
       the canal.”
       You can read the rest of the NYS Canal Corporation announcement
       here:
  HTML https://edge.sitecorecloud.io/newyorkpowe2bd0-canalsf418-productionbf60-c829/media/Files/Press-Releases/2024/20240715_NYPA_Canals_Royalton_EEIP_Project_Extension.pdf
       #Post#: 2611--------------------------------------------------
       Empire State Trail Closed - Earthen Embankment Repairs in
       Pendleton & Royalton
   DIR By: Doug K
       Date: August 1, 2024, 6:48 am
       ---------------------------------------------------------
       From the NYS Canal Authority Project Webpage - More Trail
       Closures due to unsafe Embankments
       [attachimg=1]
  HTML https://www.canals.ny.gov/Trails/Canalway-Trail-Alerts
       Here's the MAP showing the detour route and where the embankment
       work is being done
       [attachimg=2]
  HTML https://edge.sitecorecloud.io/newyorkpowe2bd0-canalsf418-productionbf60-c829/media/Images/Canals/Trails/Erie-canalway-trail-closure-73124.png
       For those who are still in "embankment denial" this should be a
       wake-up call. The Canal Corporation Earthen Embankment
       Integrity  Program is alive and well, fixing earthen embankments
       across the State, saving Erie Canal communities and neighbors
       from potential dam breaches and devastating floods.
       #Post#: 2632--------------------------------------------------
       What does an unsafe canal embankment look like? - Royalton NY 
   DIR By: Doug K
       Date: September 17, 2024, 7:26 am
       ---------------------------------------------------------
       Once again, this shows that the small part of the public still
       in "dam denial" can't stop public safety work, no matter how
       much they whine or complain on Social Media. It's sad that some
       of the public just "doesn't get it" after years of embankment
       safety work by NY State, but ignorance & denial will never be
       the right "tools" to use to stop public safety efforts to make
       this National Treasure safe, and sustainable.
       Here's a recent news article about the continued Embankment
       Repair going on in the western section of the NYS Canal System.
  HTML https://www.niagara-gazette.com/news/local_news/state-extends-erie-canal-patchwork-in-royalton/article_c9cfc3b6-808b-5b86-964c-c330a6b734c6.html
       This is what an unsafe embankment looks like, on a NYS Canal
       Trail Map... it's outlined in RED, and TRAIL TRAFFIC is CLOSED
       to the public.
       [attachimg=1]
       Here's a Press Release about the continued safety work, trying
       to add a seepage prevention wall to stop leaking, and strengthen
       the embankment wall.
  HTML https://nypa.gov/news/press-releases/2024/2024715-royalton
       And here's a great video released by the New York Power
       Authority that explains the work being done... easy to
       understand why this work is needed.
  HTML https://m.youtube.com/watch?v=BsqhHtWlE18
       Pass this message along to anyone in Perinton or Fairport NY,
       who is still supporting the Stop the Canal Clear-cut movement...
       and tell them that leaving trees on earthen dams is a danger to
       every community along the Canal System, especially if those
       trees are hiding major Erie Canal safety issues like this one in
       Royalton.
       #Post#: 2677--------------------------------------------------
       Earthen Embankment Repairs in Royalton Explained in NYPA Video
   DIR By: Doug K
       Date: December 6, 2024, 6:52 am
       ---------------------------------------------------------
       Here's a very good video explaining the massive Canal
       Corporation project to repair a failing earthen embankment in
       the western section of the Erie Canal System. This repair has
       taken nearly the entire 2024 navigation season, and has had the
       Empire State Trail detoured while construction took place.