URI:
   DIR Return Create A Forum - Home
       ---------------------------------------------------------
       Erie Canal Neighbors Association
  HTML https://ecna.createaforum.com
       ---------------------------------------------------------
       *****************************************************
   DIR Return to: Perinton/Fairport Canal Community Discussion
       *****************************************************
       #Post#: 2512--------------------------------------------------
       Perinton's Oxbow Dam: Past Erie Canal Breaches & Current
       Structural Issues
   DIR By: Doug K
       Date: December 12, 2023, 8:39 am
       ---------------------------------------------------------
       Found this interesting article about a piece of Perinton called
       The Oxbow and its history of Erie Canal Embankment Breaches.
       It's written by a local historian and includes a great image of
       what The Oxbow looked like 150 years ago.
  HTML https://www.google.com/url?sa=t&source=web&rct=j&opi=89978449&url=https://perinton.org/wp-content/uploads/The-Oxbow_part_1.pdf<br
       />
       The Oxbow
       Part One: The Early Years
       The original Erie Canal was much narrower and not as deep as
       today. Constructed with hand tools and horsepower from 1817 to
       1825, the canal had countless bends and turns as surveyors
       mapped out a route that best accounted for the elevation of the
       land, rock formations, and areas with stable soil. About a half
       mile south of the bridge over the canal at Fairport Road, the
       original path of the old Erie turned dramatically to the east
       and looped in a semi-circle, before continuing its southern path
       toward Bushnell’s Basin.
       In a stream or river, an area with this characteristic is called
       an oxbow, defined in the dictionary as “a U-shaped frame forming
       a collar around an ox's neck and holding the yoke in place,” or
       in the case of a waterway, “a bend in a river resembling an
       oxbow.” When the canal was first enlarged in the 1830’s, and
       later in the 1860’s, most of the twists and bends were removed,
       often by building an embankment to carry the canal over lower
       terrain. Such an embankment, forty feet in height, was
       constructed when the canal was relocated and straightened to the
       west of the oxbow. Water was allowed to fill the area from the
       old canal’s path to the earthen embankment, creating a small
       lake. Perinton residents took an immediate liking to the
       pleasant surroundings on the east shore of the oxbow and the new
       lake, and found it a pleasant place to picnic, camp, fish, and
       swim.
       The canal suffered frequent breaks in the early years, often at
       the site of these man-made embankments. In 1997 Perinton
       historian Sue Roberts wrote: “The first Oxbow break occurred
       November 29th, 1864. A muskrat burrowed a small hole through the
       berm. The force of the water quickly enlarged the hole –
       eventually emptying 17 miles of canal, from Montezuma to
       Rochester.”
       Another break adjacent to the oxbow, even larger than the first,
       occurred seven years later, in late April of 1871, again
       reportedly caused by a tunneling muskrat. Two hundred feet of
       the embankment was washed away, to a depth of 20 to 30 feet
       below the bottom of the canal. All the water in the canal from
       the locks at Macedon to the east and Pittsford to the west
       rushed through the breach. A nearby packet boat was flushed
       through the break, and sent on a wild ride west through farm
       fields and fences, to land part way up an elm tree. The captain,
       his wife, child and steersman were reportedly unhurt. According
       to newspaper reports, the dam at Hayward’s mill on Irondequoit
       Creek and the bridge at the Rochester Road (Fairport Road) were
       washed away.
       Repairs to the embankment were quickly begun, but trouble soon
       followed. Approximately 800 workers were hired to repair the
       break, some local, but many others from out of town. Some of the
       workers grew increasingly agitated, fueled by poor weather,
       difficult working conditions, and more than a little drinking.
       When the rowdies demanded more money for their labor and
       violence appeared imminent, the New York State Militia was
       brought in to quell the rioters.
       It's imperative that the Erie Canal Embankment in Perinton, that
       makes up the Oxbow Dam and holds back Oxbow Lake, is brought
       back into compliance for Earthen Dam Safety according to NYS
       Dept of Environmental Conservation, and also FEMA standards.
       Currently there are people actively trying to prevent that,
       including a social media group in denial about the sad state of
       Erie Canal Safety.
       Even the Perinton Supervisor is trying to ignore the obvious,
       well documented earthen dam safety issues on the Oxbow Dam, that
       have been brought up by New York State, with his new plan to
       create a viewshed zone to keep trees growing where they should
       not be, along the outboard slope of the Oxbow Dam. That new ECCO
       zone would possibly mean flood insurance requirements would
       change, and Erie Canal Neighbors living below the dam would
       remain in a Flood Inundation Zone, below a high hazard dam.
       Is that ECCO idea really a good plan for all Perinton Residents?
       Go read for yourself...
  HTML https://ecna.createaforum.com/perinton-canal-embankment-discussion/ecco-what-is-that/
       Better yet, support your Perinton Community Safety by signing
       this Petition
  HTML https://www.change.org/p/join-your-neighbors-support-vegetation-removal-from-erie-canal-for-safety
       *****************************************************
       Page 1 of 1