       Scenes from Embankment Stabilization Work in Eagle Harbor &
       Gaines Basin
   DIR By: Doug K
       Date: April 7, 2022, 12:36 pm
       ---------------------------------------------------------
       As we promised, here's some pictures from the Eagle Harbor -
       Gaines Basin Erie Canal Embankment Repair.
       It's actually TWO different work zones, that are along this 2
       mile long earthen embankment in the Town of Gaines. One of the
       work zones, nearer to the east end of this embankment, is
       getting a filter blanket constructed to abate some excessive
       seeping in the area of Beardsley Creek, the other is repair to a
       cement liner that carries the Erie Canal on the top of a 50'
       earthen embankment, across Otter Creek.
       Here's a view of Otter Creek and a Topographic Map of the
       surrounding area.
       [attachimg=1]
  HTML https://www.topoquest.com/map.php?lat=43.25339&lon=-78.23418&datum=nad83&zoom=4&map=auto&coord=d&mode=zoomin&size=m&cross=on
       Since the Erie Canal Trail is closed on BOTH ends of this repair
       I took the overland route, and followed an old game trail along
       the east side of Otter Creek to where it flows under the Canal
       Embankment near the Eagle Harbor Rd end. It was a very nice walk
       and ends up right on the South Embankment of the Erie Canal.
       [attachimg=2]
       Note: The Erie Canal runs along the right side of this picture,
       top of the hill you see.
       You can see this work on the cement lining from the Lift Bridge
       at Eagle Harbor Rd, but it's about 1/2 mile away so hard to tell
       what was being done.
       [attachimg=3]
       But the view from the south side of the Erie , when I exited the
       game trail, was amazing. This is all happening near a widewaters
       area in Eagle Harbor.
       [attachimg=4]
       I will cover the Canal Embankment Stabilization work being done
       at the Gaines Basin end of this embankment section, in a reply
       to this post. That should be up very soon.
       And for those who like a little history, here's some about how,
       when & why this embankment was built in this area.
  HTML https://www.newyorkroots.org/bookarchive/pioneerhistoryorleanscounty/ch19/eagleharbor.html
       #Post#: 2141--------------------------------------------------
       Re: Scenes from Embankment Stabilization Work in Eagle Harbor
       & Gaines Basin
   DIR By: Doug K
       Date: April 7, 2022, 12:51 pm
       ---------------------------------------------------------
       Here's the pictures from the canal embankment stabilization work
       near Gaines Basin Rd. You can see the work from the high bridge
       over the canal, but it's far off in the distance.
       [attachimg=1]
       Walking east from where the Otter Creek game trail found it's
       way to the canal, just past the wide waters, on a slightly wider
       section of channel, near culvert 85, you can see the equipment
       and crews slowly removing more invasive trees, and they have an
       excavator there to start adding the new materials for the filter
       blanket there.
       [attachimg=2]
       You can see there are trees left along the canal, at the base of
       what is about a 20' or so tall, earthen embankment. And beyond
       this area is almost all corn fields... both sides, for a few
       miles. The canal provides irrigation for this area, and farmers
       need these repairs made so that the canal can get re-watered,
       and they can start their irrigation pumps to fill farm ponds.
       This hopefully ends the mystery, and confusion, about this
       latest earthen canal dam repair.
       There's no devastation, no strip mining of canal slopes, no
       utter destruction as some would have us believe. It's just a
       small crew of NYS Canal Workers, going about the business, of
       keeping New Yorkers safe. They are doing that by insuring the
       Erie Canal is properly maintained and safe to use for yet
       another year, it's 96th year of operation with this version of
       the NYS Erie-Barge Canal. Give them a break, let them work
       without distraction.
       And the ECNA would like to say "Thank you all for your
       dedication to SAFETY along the Erie Canal"
       #Post#: 2164--------------------------------------------------
       Embankment Repair in Eagle Harbor on Empire State Trail Closure
       Page
   DIR By: Doug K
       Date: April 13, 2022, 4:28 pm
       ---------------------------------------------------------
       We were told about this GREAT new website by the New York State
       Canal Corporation.
       Can't say enough about the Canal Corporation partnerships with
       dividing up work flows better, New York Parks & Trails, Greenway
       Belt, and this great website for the New York Empire Trail
       system, mapped by each main section.
  HTML https://empiretrail.ny.gov/
       We did find the recent closure in Eagle Harbor mentioned on
       their webpage, under Trail Closures... that page may be better
       linked to the main Canal Corporation Trails page in the future,
       it lags behind a bit but is well covered here for all ECT
       enthusiast
       [attachimg=1]
  HTML https://empiretrail.ny.gov/trail-closures
       *****************************************************