URI:
   DIR Return Create A Forum - Home
       ---------------------------------------------------------
       buildingSMART Canada
  HTML https://buildingsmartcan.createaforum.com
       ---------------------------------------------------------
       *****************************************************
   DIR Return to: STANDARDS & GUIDELINES
       *****************************************************
       #Post#: 24--------------------------------------------------
       BIM Level 2 vs BIM Level 3
   DIR By: DSTATTERI
       Date: February 1, 2017, 9:04 am
       ---------------------------------------------------------
       Do you believe BIM Level 3 can be achieved if BIM Level 2 is
       hardly done? Or does BIM Level 2 have to be at an advanced stage
       (ex: full 4D & 5D) in order to aim for BIM level 3?
       Thanks
       #Post#: 33--------------------------------------------------
       Re: BIM Level 2 vs BIM Level 3
   DIR By: davidwatson
       Date: February 1, 2017, 12:51 pm
       ---------------------------------------------------------
       I don't believe Level 2 and Level 3 are really connected.  It
       just happens that Level 3 is harder to achieve, but could be
       accomplished on its own.
       #Post#: 35--------------------------------------------------
       Re: BIM Level 2 vs BIM Level 3
   DIR By: JohnKDickinson
       Date: February 1, 2017, 12:58 pm
       ---------------------------------------------------------
       I am not sure I would agree. They do seem disparate but the
       underlying intent at level 2 seems to be dealing with models,
       objects and collaboration and for Level 3 (integrated and
       interoperable BIM) those would have to be present.
       Of course, if we merely consider Level 2 as COBie then maybe it
       is possible (but a pain in the nether regions to structure and
       populate basic objects without a model).
       John
       #Post#: 43--------------------------------------------------
       Re: BIM Level 2 vs BIM Level 3
   DIR By: MeganBeange
       Date: February 1, 2017, 2:17 pm
       ---------------------------------------------------------
       I think it also depends on scope...
       IF we are talking Levels 2 & 3 pan-Canadian, or pan-industry, I
       agree that it Level 2 would have to be mostly present for Level
       3 to succeed.
       If we are talking at the level of let's say an international
       architecture or engineering firm, or a singular multi-million
       dollar project, I think that Level 3 could be set up within a
       specific parameter as a full leap forward, regardless of
       existing status.
       #Post#: 47--------------------------------------------------
       Re: BIM Level 2 vs BIM Level 3
   DIR By: kstalkie
       Date: February 2, 2017, 8:56 am
       ---------------------------------------------------------
       I think the intent of Level 2 is more to get the industry used
       to working with new processes. It will help flush out the
       problems including contract language, collaboration and model
       hand off. It needs to be treated as a step along the BIM
       journey, not as the destination that many see it as.
       #Post#: 48--------------------------------------------------
       Re: BIM Level 2 vs BIM Level 3
   DIR By: dave.a1981
       Date: February 2, 2017, 9:10 am
       ---------------------------------------------------------
       Great discussion about BIM L 2and 3. BIM Level 2 should be used
       as the platform to gear businesses up for a L3 workflow, which
       is currently still being defined, as it is looking to pull IoT
       and Smart Cities Initiatives in to it. You may be interested to
       know that the UK wont be calling it BIM L3, it will be called UK
       Construction Level 3 or something similar.
       *****************************************************
       Page 1 of 1